Laserfiche WebLink
Pa=4 o5S <br />Total acres <br />backfilled: <br />Total acres <br />seeded wl <br />pp roved oinc <br />Total acresTotal <br />wltopsoil <br />laced: <br />acres <br />mulched wf <br />approyedvaakL <br />Total acres <br />Total acres <br />TopsoilMulch <br />WTica£iou <br />. <br />graded <br />fertilized w/ <br />replacement <br />rate(tous� <br />_ley <br />a vd fertilizer <br />depth (in.): <br />Seed <br />Fertilizer <br />Mulch <br />application <br />application <br />I <br />application <br />method: <br />method: <br />method: <br />13. Is weed control being conducted in accordance with an approved Weed Control Plan? YES NO N. --A <br />If "YES", indicate the weed species, control area, control type, application rate and treatment date on the report map. <br />14. Is adequate topsoil reserved for reclamation, based on your approved permit? <br />If "NO", please explain: <br />15. Is the reserve l topsoil vegetated/stabilized irfordance with Rule 3.1.9(1)? <br />If "NO" please explain: <br />YES NO N/A <br />ES NO NrA <br />16. If mining has exposed groundwater, is the site in compliance with the approved mining plan and Office of th tate <br />21. As required by Colorado Mined Land Reclamation Act and/or Colorado Land Reclamation Act for the Extraction of <br />Construction Materials (C.R.S. 34-32-116 or 34-32.5-116), attach a map to this report that accurately depicts the permit <br />boundary, current affected area boundary and location of the acreages specified in items 7- 12 and 14. UPDATED <br />MAP ATTACHED: <br />Engineer (Well Permit, S.W.S.P., and/or Permanent Augmentation Plan)? YES NO <br />17. Are all hazardous materials stored within approved spill containment structures? YES NO IA <br />18. Is your financial warranty value sufficient to cover the cost to complete reclamation? CY5 <br />NO NIA <br />19. is your basis for legal right to enter still valid? ES NO <br />20. Does your permit require you to submit monitoring information annually? YES 0NIA <br />If "Yes", please attach the required monitoring results to this Annual Repor—V <br />t <br />. <br />