My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-11-07_REVISION - C1981019 (8)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981019
>
2017-11-07_REVISION - C1981019 (8)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/7/2017 12:50:04 PM
Creation date
11/7/2017 12:24:39 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Revision
Doc Date
11/7/2017
Doc Name
Adequacy Review
From
DRMS
To
Colowyo Coal Company LP
Type & Sequence
TR114
Email Name
ZTT
JRS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bulldozer Worksheet Cont'd <br />Task # 001 Page 2 of 2 <br />Job efficiency: <br />0.830 <br />, -_ (1 SHIFT/DAY) -� <br />' ^ <br />Spoil pile: <br />0.800 <br />(FND-RF) <br />Push gradient: <br />1.000 <br />(CAT HB) <br />Altitude: <br />1.000 <br />(CAT HB) <br />Material Weight: <br />0.697 <br />i <br />(CAT HB) <br />Blade type: <br />1.000 <br />(PAT) <br />Net correction: 0.3124 <br />Adjusted unit production: 437.36 LCY/hr <br />Adjusted fleet production: 437.36 LCY/hr _ <br />JOB TIME AND COST <br />Fleet size: I Dozer(s) _ <br />Unit cost: `$0.439/LCY <br />Total job time: 2.22 Hours ' <br />Total job cost: _$426------- <br />
The URL can be used to link to this page
Your browser does not support the video tag.