Laserfiche WebLink
Basil Bear <br />Page 2 <br />11/7/2017 <br />4. Please update Figure 2 to reflect the removal of site 2011-1 from the phase I request. <br />5. Please update Figure 3 to reflect the change at the ROM Pond from a Phase II request to a <br />Phase I request. <br />6. Please update Exhibit 2 with the removal of site 2011-1 from the request for bond release. <br />7. Due to the sparseness of records, the Division will propose to release Phase I liability for <br />the plugging and sealing work associated for Boreholes 1, 2, 3 and 4; unless, <br />documentation is provided by the Operator providing more information on these areas. <br />The surface disturbance associated with the boreholes was in areas Phase I released in <br />SL -04. <br />This concludes the Division's Preliminary Adequacy Review for the Bowie SL -6 partial surety <br />release request. If you have any questions, please feel free to contact me. <br />Sincerely, <br />do—X�Si/wIl <br />Clayton Wein <br />Environmental Protection Specialist <br />clayton.wein@state.co.us <br />555 Street Address, Room 555, Denver, CO 55555.5555 P 555.555.5555 <br />