Laserfiche WebLink
Importation of the above listed waste materials will aid in achieving the approved <br /> post mining topography and a surface elevation at least 2 feet above the prevailing <br /> ground water level. <br /> f. "a general engineering plan stating how the material will be placed and <br /> stabilized in a manner to avoid unacceptable settling and voids. <br /> Placement of the imported above listed waste materials into the pit and other areas <br /> now receiving processing fines will, at a minimum, raise the final topography to at <br /> least two feet above the prevailing ground water elevation. <br /> The above listed imported waste materials and the processing facility waste fines will <br /> be graded in conformance with the already approved reclamation plan. Aged <br /> concrete waste, when backfilled, will be covered with earthen material and worked to <br /> eliminate voids. Therefore, since all imported waste material will be used to backfill <br /> mined out pits and other such areas, and reclaimed slopes will be 3H:1 V or less, it is <br /> unlikely any stability issues shall occur. <br /> e ectfully, <br /> Jerald Schnabel <br /> President <br /> Transit Mix Concrete Co. <br /> 3 <br />