Laserfiche WebLink
alluvial valley floors during surface coal mining and reclamation operations, and is to <br />be continued until all bonds are released in accordance with Rule 3 (4.24.4). <br />XVIII. Operations on Prime Farmland — Rule 4.25 <br />The King Coal Mine will not disturb or otherwise affect any prime farmland. <br />XIX. Mountaintop Removal — Rule 4.26 <br />This section does not apply to the King Coal Mine permit application <br />XX. Operations on Steep Slopes — Rule 4.27 <br />This section does not apply to the King Coal Mine permit application document. The <br />Division does not propose to approve any variances pertaining to steep slope mining and <br />approximate original contour with this decision document. <br />XXI. In Situ Processing — Rule 4.29 <br />No in situ processing activities are proposed for the King Coal Mine. <br />This concludes the Proposed Decision and Findings of Compliance for the King Coal Mine Permit <br />(C-1981-035) Renewal 07. <br />29 <br />