Laserfiche WebLink
3. Haul Roads and Access <br /> All of the internal haul roads and parking area around the office and scale house will be topsoiled <br /> following the completion of mining. <br /> 4. Reclamation Timetable <br /> Reclamation of the Ready Mix Pit will mostly be completed concurrently with mining. <br /> Therefore, refer to Table D-2 in Exhibit D for a timetable of the operation's life, including <br /> reclamation. <br /> 5. Revegetation Plan <br /> Following the placement of topsoil, seeding will take place in the next soonest appropriate <br /> planting season. This will either be in the spring(March 15-April 15) or in the fall (September <br /> 15-November 15). The topsoil will be disked or harrowed in advance of seed application. <br /> Table E-1 shows the seed mix and seeding rates that will be applied at the Ready Mix Pit. <br /> Table E-2 Seed Mixes <br /> Dryland Seed Mix <br /> Plant Seeding rate(lbs of PLS/ac) <br /> Western Wheatgrass(rosanna) 6 <br /> Thickspike Wheatgrass(critana) 2 <br /> Streambank Wheatgrass(sodar) 2 <br /> Sheep fescue(covar) 1 <br /> Sandberg bluegrass 1 <br /> Total 12 <br /> Wetland Seed Mix <br /> Plant <br /> Slender wheatgrass(san luis) 1 <br /> Timothy 2 <br /> Redtop grass 0.5 <br /> Smooth Brome(manchar) 2 <br /> Total 1 5.5 <br /> Ready Mix Pit October 2017 E-2 4, i&wN k;mad Aso.Wm,PIA <br />