My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-11-02_REVISION - M1993059
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1993059
>
2017-11-02_REVISION - M1993059
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:25:35 PM
Creation date
11/2/2017 3:26:11 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1993059
IBM Index Class Name
Revision
Doc Date
11/2/2017
Doc Name
Request for Technical Revision
From
Eastern Colorado Aggregates, RLLLP
To
DRMS
Type & Sequence
TR6
Email Name
AME
WHE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EASTERN COLORADO AGGREGATES, L.L.L.P. <br />Main Office- P.O. Box 580 • Rye, CO 81069 <br />Phone (719)489-3385 9 Fax(719)489-2268 <br />October 19, 2017 <br />Ms. Amy Eschberger, Environmental Protection Specialist <br />Colorado Division of Reclamation, Mining and Safety <br />Department of Natural Resources <br />1313 Sherman St., Room 215 <br />Denver, Colorado 80203 <br />Plant P. 0. Box 307 • Holly: CO 81047 <br />Phone: (719)537-0117 • Fax (719)537-0115 <br />Re: Midwestern Farms, Permit No. M-1993-059, Technical Revision 6, Eastern Shoreline Riprap <br />Blanket. <br />Dear Ms. Amy Eschberger, <br />Please find enclosed the following items for the above referenced technical revision. <br />Exhibit F — Reclamation Plan Map - Please see the revised (3) reclamation plan map <br />with 2,000 feet of eastern shoreline, regraded to correct erosion damage and <br />installation of 6 inch nominal diameter rip rap blanket. The estimated cost of the <br />regrading, rip rap material and rip rap installation is $30,000. <br />2. Revised Exhibit E-1 and E-2 which have been revised to show the 6 foot wide riprap <br />blanket on the 6:1 and 3:1 cross sections. <br />3. Technical revision cover sheet and a check for $216 to pay the TR fee. /'leKsc r•Ck'a v <br />g <br />If you have questions, comments or require additional information, please call. <br />Sincerely <br />Eastern Colorado Aggregates, RLLLP <br />im. Z�- <br />David A. King <br />Attachments <br />Exhibit F — Reclamation Plan Map — Revised 2/17/2017 —11"x17" exhibit <br />
The URL can be used to link to this page
Your browser does not support the video tag.