Laserfiche WebLink
i I4-C,5e 1UWlb?rs rye ie'L recta 61 6aG'C ckSeJ -+ 1(15 ci"1 pr 0/4'. <br />r <br />4- Sea c, ( rec la makori for -Hrt.e cru rreA+ q p pro ve cJ acre Is /)6-t-CO ktp le k c + + <br />4-1 rVt r OF -f-f,\, S 1`e p©rt--.Page 4 of 5 <br />Total acres Total acresTotal acres Total acres <br />backfilled: I seeded w/ V.~J/' <br />w/topsoil mulched w/ <br />approved mix: r I acre. replaced: I QC <br />approved mulch: <br />Total acres Total acres Topsoil Mulch application <br />graded: I fertilized w/ a kr. replacement rate(tons): ftc're.- apvd fertilizer: depth(in.): <br />Seed 1 j7 Fertilizer Mulch N/A- <br />application application application U5E-B EXISTI tSJ <br />method: BR® T- method:Nf fit method:5 w{ Aii i -#4 - <br />13. Is weed control being conducted in accordance with an approved Weed Control Plan? NO N/A <br />If"YES", indicate the weed species, control area control type, application rate and treatment date on the report map. <br />TOflp yC W/ S y 1 s// i ao l-• <br />o, 'd of +-"- 1 1 acre 'b®4' c )' <br />H-aeld Wee!Si' c,JQs d nr +0 remove, v s bie- 4-vad JaX ;,n lbtl3 <br />14. Is adequate topsoil eserved for reclamation, based on your approved permit? 1 YES NO N/A <br />If"NO",please explain: <br />15. Is the reserved topsoil vegetated/stabilized in accordance with Rule 3.1.9(1 ? NO N/A <br />If"NO"please explain: ( rev T 0 u s (6 F1-erL G qs been bac k-h U feel `- <br />S d. Carrenf( aapcf107fr-e d;f <br />rre i` ul;(( Cnn"ii ue 'oct <br />I o/31 ill a pare rtofe" bee" S fah i(1`2-4 &Dr seeded a fi +die -ke me_ <br />o j tl-,T s ,rte port, bait w;i be a orSkt)i-1--)F{er C'eiaAo 1 of- Vtac)irlCr , <br />16. If mining has exposed groundwater, is the site in compliance ith the approved mining plan and Office of the'State <br />Engineer(Well Permit, S.W.S.P., and/or Permanent Augmentation Plan)?YES NO (79 <br />17. Are all hazardous materials stored within approved spill containment structures?YES NO 412 <br />18. Is your financial warranty value sufficient to cover the cost to complete reclamation? NO N/A <br />19. Is your basis for legal right to enter still valid? ogP NO <br />20. Does your permit require you to submit monitoring information annually? 40 NO N/A <br />If"Yes", please attach the required monitoring results to this Annual Report. <br />21. As required by Colorado Mined Land Reclamation Act and/or Colorado Land Reclamation Act for the Extraction of <br />Construction Materials(C.R.S.34-32-116 or 34-32.5-116),attach a map to this report that accurately depicts the permit <br />boundary, current affected area boundary and location.of the acreages specified in items 7- 12 and 14. UPDATED <br />MAP ATTACHED: .7