Laserfiche WebLink
Pond NHN-001 and Collection Ditches <br />Activity <br />Reclamation Timing <br />Re rade Pond NHN-001 and Collection Ditches <br />2024-2026 <br />Replace Topsoil on Pond NHN-001 and Collection Ditches <br />2024-2026 <br />Reve etate Pond NHN-001 and Collection Ditches <br />2024-2026 <br />Pond NHN-002 and Collection Ditches <br />Activity <br />Reclamation Timing <br />Re rade Pond NHN-002 and Collection Ditches <br />2024-2026 <br />Replace Topsoil on Pond NHN-002 and Collection Ditches <br />2024-2026 <br />Reve etate Pond NHN-002 and Collection Ditches <br />2024-2026 <br />Topsoil Stockpiles <br />Activity <br />Reclamation Timing <br />Re rade/Finish Grade Topsoil Stockpile Areas <br />2017-2026 <br />Replace Topsoil on Topsoil Stockpile Areas <br />2017-2026 <br />Reve etate Topsoil Stockpile Areas <br />2017-2026 <br />During the next 5 -year permit term, NHN wishes to maintain the equipment corridor, area north <br />of Meehan Draw, and Pond NHN-003 and collection ditches as permitted but not bonded items, <br />since it is not anticipated these areas will be disturbed. If future disturbance of these areas is <br />anticipated, adequate bond will be posted prior to disturbance. <br />Section 3.02.2 Page 2 July 2017 (RN -01) <br />