My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-10-30_GENERAL DOCUMENTS - C1981013
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981013
>
2017-10-30_GENERAL DOCUMENTS - C1981013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2017 7:05:11 AM
Creation date
11/1/2017 7:00:50 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981013
IBM Index Class Name
General Documents
Doc Date
10/30/2017
Doc Name Note
SL7
Doc Name
Proposed Decision and Findings of Compliance
From
DRMS
To
New Elk Coal Company, LLC
Permit Index Doc Type
Findings
Email Name
RDZ
JRS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
II. CRITERIA AND SCHEDULE FOR BOND RELEASE <br />PHASE I <br />Rule 3.03.1(2)(a) states, "Up to sixty percent of the applicable bond amount shall be released when the <br />permittee successfully completes backfilling, regrading, and drainage control in accordance with the <br />approved reclamation plan." The remaining parcel affiliated with the Golden Eagle Mine permit, the NW - <br />1 vent/fan site, was given Phase I bond release in August 2005. <br />PHASE II <br />Rule 3.03.1(2)(b) states, "Up to eighty-five percent of the applicable bond amount shall be released upon <br />the establishment of vegetation which supports the approved post -mining land use and which meets the <br />approved success standard for cover... based on statistically valid data collected during a single year of the <br />liability period". In regard to Phase II bond release, Rule 3.03.2(3)(b) also states, " No more than sixty <br />(60) percent of the bond shall be released so long as the lands to which the release would be applicable are <br />contributing suspended solids to streamflow or runoff outside the permit area in excess of pre -mining <br />levels as determined by baseline data or in excess of levels determined on adjacent non -mined areas." <br />The approved reclamation plan for the NW -1 vent/fan site includes topsoil replacement, seeding, and <br />vegetative cover success standards. These standards are not being evaluated with this SL -07 bond <br />release process since the site remains permitted with the Division. The standards will need to be <br />evaluated when NECC requests Phase II bond release of the site as part of a New Elk Mine bond <br />release application in the future. (Currently such an application has not been filed by NECC.). In <br />addition to an evaluation of vegetative cover success standards, the Division will assess the merits of this <br />future application in terms of support of post -mining land uses and a suspended solids demonstration. <br />PHASE III <br />Rule 3.03.1(2)(c) states that the final portion of performance bond, "shall be released when the permittee <br />has successfully completed all surface coal mining reclamation operations in accordance with this <br />approved reclamation plan, and the final inspection procedures of 3.03.2 have been satisfied. This shall <br />not be before the expiration of the period specified for revegetation responsibility in 3.02.3." Rule <br />3.03.1(4) states, " No bond shall be fully released until all reclamation requirements of these Rules and the <br />Act are fully met...". The same rule goes on to state, " No acreage shall be released from the permit area <br />until all surface coal mining and reclamation operations on that acreage have been completed in <br />accordance with the approved reclamation plan." <br />The approved reclamation plan for the NW -1 vent/fan site includes backfilling and grading to approved <br />contours, drainage control and reestablishment, topsoil replacement, re -vegetation success, support of <br />post -mining land uses, and protection of the hydrologic balance. These factors are not being evaluated <br />with this SL -07 bond release process since the site remains permitted with the Division. The <br />Golden Eagle Mine Partial Phase II and III Bond Release (SL -07) <br />Permit Number C-1981-013 Page 4 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.