My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-09-19_PERMIT FILE - C1981019A (2)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981019
>
2017-09-19_PERMIT FILE - C1981019A (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/25/2018 8:55:22 AM
Creation date
10/31/2017 7:29:13 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019A
IBM Index Class Name
Permit File
Doc Date
9/19/2017
Doc Name
Cumulative Bond Schedule
Section_Exhibit Name
Exhibit 13C
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BULLDOZER RIPPING WORK <br />Task description: Rip 29,458' of Collom Haul Road <br />Site: Colowyo Coal Mine Permit Action: 13C Permit/Job#: C1981019 <br />Seismic: <br />Area: <br />PROJECT IDENTIFICATION <br />Task #: 003 State: Colorado <br />Date: 3/15/2017 County: Moffat <br />User: ZTT <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: OBSOLETE - Cat D11R - <br />11 SU <br />Ripper Attachment: 1 -Shank Ripper <br />Abbreviation: None <br />Filename: CO 19-003 <br />Horsepower: <br />850 <br />Shift Basis: <br />1 per day <br />Data Source: <br />(CRG) <br />Cost Breakdown: <br />NA <br />BCY <br />18.90 acres Rip Depth (ft): <br />1.50 <br />Utilization % <br />Ownership Cost/Hour: <br />$220.12 <br />NA <br />Operating Cost/Hour: <br />$235.69 <br />100 <br />Ripper Ownership Cost/Hour: <br />$21.79 <br />NA <br />Ripper Operating Cost/Hour: <br />$11.30 <br />100 <br />Operator Cost/Hour: <br />$41.85 <br />NA <br />Total Unit Cost/Hour: <br />$530.75 <br />mph <br />Total Fleet Cost/Hour: $1,061.49 <br />MATERIAL QUANTITIES Selected estimating method: <br />Alternate Methods: <br />Area <br />NA Bank Volume: <br />NA <br />BCY <br />18.90 acres Rip Depth (ft): <br />1.50 <br />Volume: 45,738 <br />Source of estimated quantity: Table 7 <br />Exh. 13B -T-20 <br />HOURLY PRODUCTION <br />Seismic: <br />Seismic Velocity: <br />NA <br />feet/second <br />Area: <br />Average Ripping Depth: <br />3.00 <br />mph <br />Average Ripping Width: <br />7.94 <br />degrees <br />Average Ripping Length: <br />300.00 <br />feet <br />Average Dozer Speed: <br />88.00 <br />feet <br />Average Maneuver Time: <br />0.25 <br />feet <br />Production per unit area: <br />0.897 <br />acres/hour <br />Job Condition Correction Factors <br />Unadjusted Hourly Unit Production: <br />0.897 <br />Acres/hr <br />Site Altitude: <br />7,500 <br />feet <br />Altitude Adj: <br />1.00 <br />(CAT HB) <br />Job Efficiency: <br />0.83 <br />(1 shift/day) <br />Net Correction: <br />0.83 <br />multiplier <br />Adjusted Hourly Unit Production: <br />0.74 <br />Acres/hr <br />Adjusted Hourly Fleet Production: <br />1.49 <br />Acres/hr <br />JOB TIME AND COST <br />Fleet size: 2 Grader(s) <br />Total job time: <br />12.70 <br />Unit cost: $713.149 Per acre <br />Total job cost: $13,478 <br />NA <br />BCY or CCY <br />Hours <br />rrorcc �,.... vim.:......:..,, e,.a.......e <br />
The URL can be used to link to this page
Your browser does not support the video tag.