My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-09-19_PERMIT FILE - C1981019A (2)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981019
>
2017-09-19_PERMIT FILE - C1981019A (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/25/2018 8:55:22 AM
Creation date
10/31/2017 7:29:13 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019A
IBM Index Class Name
Permit File
Doc Date
9/19/2017
Doc Name
Cumulative Bond Schedule
Section_Exhibit Name
Exhibit 13C
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DEMOLITION WORK <br />Task description: Remove Collom Haul Road and <br />Site: Colowyo Coal Mine Permit Action: 13C <br />PROJECT IDENTIFICATION <br />Task #: 001 <br />Date: 3/14/2017 <br />User: ZTT <br />UNIT COSTS <br />State: Colorado <br />County: Moffat <br />Agency or organization name: DRMS <br />Culverts <br />Permit/Job#: C1981019 <br />Abbreviation: None <br />Filename: C019-001 <br />Location adjustment: 95.50 % <br />Structure or Item <br />Dimensions <br />Demolition Menu <br />Quantity <br />Unit <br />Unit <br />Total Cost <br />Description <br />Selection <br />Cost <br />Remove 24" Culverts <br />24" <br />Pipe, corrugated metal <br />397.00 <br />LF <br />$6.47 <br />$2,569.38 <br />(CMP) - 24 in. diameter <br />pipe <br />Remove 36" Culverts <br />36" <br />Pipe, corrugated metal <br />6,870.00 <br />LF <br />$10.09 <br />$69,325.17 <br />(CMP) - 36 in. diameter <br />ie <br />Remove 60" Culverts <br />60" <br />Pipe, corrugated metal <br />629.00 <br />LF <br />$19.65 <br />$12,357.33 <br />(CMP) - 60 in. diameter <br />pipe <br />Remove 144" Culvert <br />144" <br />Pipe, corrugated metal <br />217.00 <br />LF <br />$69.68 <br />$15,120.99 <br />(CMP) - 144 in. diameter <br />ie <br />Demo 144" Culvert <br />2 x 217' <br />Demo. and on-site <br />434.00 <br />LF <br />$2.82 <br />$1,223.88 <br />Footers <br />disposal in excavated pit, <br />2.0 ft. x 3 ft. - Max. 200 <br />ft. push <br />Job Hours: 24.00 <br />Total Cost <br />Subtotal (adjusted for <br />(unadjusted): $100,596.75 location): $96,069.90 <br />
The URL can be used to link to this page
Your browser does not support the video tag.