Laserfiche WebLink
FA <br />EXHIBIT 13C <br />Pump House Building and Raw Water Pipeline <br />Tables 13C-18 through 13C- 20 provides items necessary to demolish the pump house building <br />and revegetate the raw water line installation. <br />Volume 20 <br />Table 13C-18 Raw Water Pump Building Requirements <br />20'x32'x14' <br />Steel Building <br />14 Steel Manhole <br />covers(4'x2'x4') <br />Precast Concrete <br />Vault <br />(6'x18'x8') <br />Table 13C-19 Topsoil Requirements for Raw Water Pipeline* <br />Topsoil Volume <br />Item Name <br />(cubic yards <br />Raw Water <br />27,326 <br />Line <br />*Topsoil will be windrowed directly adjacent to disturbance area. <br />Table 13C-20 Revegetation Requirements for Raw Water Pipeline <br />Acres to be Acres to be j <br />Item Name <br />Disturbed Reseeded <br />Raw Water <br />Line 1 <br />33.87 <br />Page 11 <br />33.87 <br />Revision Date: 12/30/16 <br />Revision No.: TR -108 <br />