Laserfiche WebLink
4- <br />12. Prima future(Post-mining)land use(check one): <br />Cropland(CR) n Pastureland(PL) E General Agriculture(GA) <br />11 Rangeland(RL)11 Forestry(FR) Wildlife Habitat(WL) <br />nResidential(RS)E Recreation(RC) Industrial/Commercial(IC) <br />Developed Water Resources(WR) Solid Waste Disposal(WD) <br />13. Primary present land use(check one : <br />0 Cropland(CR) Pastureland(PL) General Agriculture(GA) <br />D Rangeland(RL)71 Forestry(FR) Wildlife Habitat(WL) <br />Residential(RS) Recreation(RC)II Industrial/Commercial(IC) <br />Developed Water Resources(WR) <br />14. Method of Mining: Briefly explain mining method(e.g.truck/shovel): <br />This is a dry mine operation. Heavy equipment,such as front end loaders and dozers will be used to remove material from the site and transport it to the processing equipment. <br />15. On Site Processing: I I Crushing/Screening <br />13.1 Briefly explain mining method(e.g.truck/shovel): <br />A crushing spread will be on-site and used to process the raw aggregate into usable material. <br />List any designated chemicals or acid-producing materials to be used or stored within permit area: <br />None <br />16. Description of Amendment or Conversion: <br />If you are amending or converting an existing operation,provide a brief narrative describing the proposed change(s). <br />This pit was originally permitted as a 110 Limited Impact operation. This application requests to <br />expand that original permit from 9.95 acres to 54.43 acres.