Laserfiche WebLink
coT <br />" $ COLORADO DI` ual Report Past <br />{•�"1313 Sherman' 0 Violations <br />187 * JLE, ME <br />Due(10128)! ID SAFETY <br />REQUEST FOR TECHNICAL REVISION TR COVER SHEET <br />File No.: M- / tgq- 000 Site Name: <br />County L hPlt 65� TR# MEMS Use only) <br />Permittee: 19AKUJS 09P& ISIVNJI5 609Pd AA-tZatsl CEIV ED <br />Operator (If Other than Permittee): OCT 3 U 2017 <br />Permittee Representative: ��-��' y G t p MIN WME) C4n0N <br />Please provide a brief description of the proposed revision: CiAA06-0 QP <br />-rj�t w l 1 KoLn AFrg-C-1-1 /,- G Jam/ ?, TI41,!- <br />spu?_044[T7?%4? r—,91- PC7�e—S <br />As defined by the Minerals Rules, a Technical Revision (TR) is: "a change in the permit or application <br />which does not have more than a minor effect upon the approved or proposed Reclamation or <br />Environmental Protection Plan." The Division is charged with determining if the revision as submitted <br />meets this definition. If the Division determines that the proposed revision is beyond the scope of a TR, <br />the Division may require the submittal of a permit amendment to make the required or desired changes <br />to the permit. <br />The request for a TR is not considered "filed for review" until the appropriate fee is received by the <br />Division (as listed below by permit type). Please submit the appropriate fee with your request to <br />expedite the review process. After the TR is submitted with the appropriate fee, the Division will <br />determine if it is approvable within 30 days. if the Division requires additional information to approve a <br />TR, you will be notified of specific deficiencies that will need to be addressed. if at the end of the 30 <br />day review period there are still outstanding deficiencies, the Division must deny the TR unless the <br />permittee requests additional time, in writing, to provide the required information. <br />There is no pre -defined format for the submittal of a TR; however, it is up to the permittee to provide <br />sufficient information to the Division to approve the TR request, including updated mining and <br />reclamation plan maps that accurately depict the changes proposed in the requested TR. <br />Required Fees for Technical Revision by Permit Type - Please mark the correct fee and submit it with <br />your request for a Technical Revision. <br />Permit Tyne Renuired TR Fee Submitted (mark only one) <br />I I Oc, 111, 112 construction <br />materials, and 112 quarries $216 <br />112 hard rock (not DMO) $175 ❑ <br />I l Od, 112d(l, 2 or 3) $1006 ❑ <br />