My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-10-30_REVISION - M1983090
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1983090
>
2017-10-30_REVISION - M1983090
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:31:07 PM
Creation date
10/30/2017 10:39:18 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1983090
IBM Index Class Name
Revision
Doc Date
10/30/2017
Doc Name
Adequacy Review #2
From
DRMS
To
Civil Resources, LLC
Type & Sequence
AM2
Email Name
ECS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Andrew Rodriguez <br />Oct 30, 2017 <br />Pale 2 of 3 <br />contained on the area of affected land and within two hundred (200) feet of the affected land. <br />There is a structure shown on figure 2a and figure 3 near the SW corner of the largest lined <br />reservoir that is not properly identified. This structure is not shown on the figure 4 reclamation <br />plan map -- what is it, and will it be removed prior to release request? <br />The as -built configurations of the existing approved slurry walls will need to be included on all <br />maps. <br />Please remove all extraneous features.`information for features that are not within 200 feet of the <br />permit boundary or referenced in the application from all provided maps. Please label/number <br />on-site ponds individually for proper reference and to correspond with provided SWO liner <br />approval letter. <br />EXHIBIT E - Reclamation Plan (Rule 6.4.5): <br />(2)(e) A plan or schedule indicating how and when reclamation will be implemented... <br />The Division will assume at this time that all exposed groundwater bodies will be lined with a slurry wall for <br />planning and bonding purposes. <br />The permittee will need to commit to submitting a technical revision detailing the proposed construction <br />specifications and configuration prior to installation of any additional slurry walls on-site. <br />The permittee will need to commit to submitting a technical revision to the permit if the final reclamation plan <br />differs from the configuration currently shown in AM02, or if existing exposed groundwater areas will not be <br />isolated from the alluvial aquifer with a slurry wall approved by the SEO. <br />EXHIBIT F - Reclamation Plan Map (Rule 6.4.6): <br />Please indicate acreages referred to in Exhibit L (scarified ground, topsoil replacement, seeding) on figure 4 <br />Rec Plan map. Please show as -built slurry walls and "proposed" slurry wall locations/configurations used to <br />calculate footage costs for Exhibit L. <br />EXHIBIT L - Reclamation Costs Rule 6.4.12): <br />(1) All information necessary to calculate the costs of reclamation must be submitted and broken down into <br />the various major phases of reclamation. You must provide sufficient information to calculate the cost of <br />reclamation that would be incurred by the state. This should also include cost for installation of appropriate <br />flood control structures for reservoirs in the flood plain. <br />What is the source of the unit cost for slurry wall installation utilized? <br />EXHIBIT S - Permanent Man -Made Structures (Rule 6.4.19): <br />Please note that roadways and above -ground or_underground utilities (if present) within 200 feet of the <br />prol2osed affected area are considered permanent man-made structures. In accordance with Rule 6.4.19, when <br />mining operations will adversely affect the stability of any significant, valuable and permanent man-made <br />structure located within 200 feet of the affected area, the applicant may either: <br />a.) Provide a notarized agreement between the applicant and the person(s) having an interest in the structure, <br />that the applicant is to provide compensation for any damage to the structure; or <br />b.) Where such an agreement cannot be reached, the applicant shall provide an appropriate engineering <br />
The URL can be used to link to this page
Your browser does not support the video tag.