Laserfiche WebLink
October 19, 2017 C-1981-018/Deserado Mine JDM <br /> <br /> <br />Number of Partial Inspection this Fiscal Year: 3 <br />Number of Complete Inspections this Fiscal Year: 1 <br /> <br /> Page 4 of 6 <br /> <br />GENERAL MINE PLAN COMPLIANCE: <br /> <br />No permitting actions are on-going with the Division. Construction of the 13L return shaft has been completed <br />and will remain idle until mining begins in the new panel. The 13L Return Shaft was approved under TR-71. The <br />site consists of the return shaft pad, a two cell mud pit and access road. Equipment on site included the drill rig, a <br />back hoe tractor, two flatbed trailers and trucks, and a small D-6 dozer. No issues were noted. The mud pits are <br />beginning to evaporated and dry out, at which time they will be backfilled and graded. <br /> <br /> <br />ROADS – Rule 4.03 Construction 4.03.1(3)/4.03.2(3) Drainage 4.03.1(4)/4.03.2(4) Surfacing and <br />Maintenance4.03.1(5) and (6)/4.03.2(5) and (6) Reclamation 4.03.1(7)/4.03.2(7): <br /> <br />The Deserado Mine road is well maintained and in good condition. The haul road from the facilities area to the <br />refuse disposal area was wet from recent dust suppression and stable with no problems noted. The conveyor <br />corridor road, access roads and light-use roads were in good condition with no problems noted. <br /> <br /> <br />