Laserfiche WebLink
October 17, 2017 C-1994-082/Yoast Mine JDM <br /> <br /> <br />Number of Partial Inspection this Fiscal Year: 3 <br />Number of Complete Inspections this Fiscal Year: 1 <br /> <br /> Page 3 of 4 <br /> <br /> Pond 013 Pond 014 <br /> Pond 012 <br /> <br />Permanent drainages were stable with no issues noted during the inspection. <br /> <br />ROADS – Rule 4.03 Construction 4.03.1(3)/4.03.2(3) Drainage 4.03.1(4)/4.03.2(4) Surfacing and <br />Maintenance4.03.1(5) and (6)/4.03.2(5) and (6) Reclamation 4.03.1(7)/4.03.2(7): <br /> <br />The roads throughout the site were dry and stable with no problems noted. All permanent roads were accessible. <br /> <br /> <br />DOCUMENTS RECEIVED - NA <br />OTHER (SPECIFY) - NA <br /> <br />