My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-09-28_REVISION - M1981185 (203)
>
Day Forward
>
Revision
>
Minerals
>
M1981185
>
2017-09-28_REVISION - M1981185 (203)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 5:25:01 PM
Creation date
10/26/2017 8:40:27 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1981185
IBM Index Class Name
Revision
Doc Date
9/28/2017
Doc Name Note
Map D-1
Doc Name
Request For Amendment To Permit
From
Sunrise Mining, LLC
To
DRMS
Type & Sequence
AR2
Email Name
LJW
GRM
Media Type
M
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
%SUNRISE MINING, LLC <br />~` <br />LOCATED IN SECTION Z 1 AND SECTION 2 8 <br />W ■ 4 PAYDAY MAY DjAY'�X { <br />T. 3 6 N., R. � N. M. P. M. �� IDAHO ' NO. CHIEF <br />LA PLATA COUNTY, STATE OF COLORADO <br />J <br />Permit Boundary (295.79 acres) <br />Affected Area <br />Warehouse <br />Base of Operations <br />- Study Area <br />- Surface Ore Stockpile <br />Snow Storage Area <br />To be Maintained <br />Access Road <br />Private Access <br />Idaho Spring <br />Culvert <br />—X Proposed Utility <br />GLORY HOLE <br />SECTION 2B <br />i <br />KEY MAP <br />7 ° = Soo , NORTH <br />AFFECTED MINE LAND SUMMARY <br />MINE DEVELOPMENT AFFECTED AREA <br />Base of Operations <br />6.0 acres <br />plus new access road <br />2.1 acres <br />to La Plata Bridge <br />3.1 acres <br />May Day No. 1 <br />3.2 acres <br />May Day No. 1 East <br />0,8 acres <br />May Day No, 2 <br />3.3 acres <br />May Day No. 2 East <br />0,5 acres <br />Idaho Pay Day <br />16.5 acres <br />Chief Portal <br />0.5 acres <br />May Day No3 <br />5.0 acres <br />Pre Existing ACCESS ROADS <br />La Plata River Bridge to Chief <br />6.0 acres <br />May Day No 2 to May Day No, 1 <br />2.1 acres <br />May Day 1 to May Day No. 1 East <br />0.9 acres <br />May day East to Brooklyn <br />1.5 acres <br />May Day No 1 to Chief Portal <br />1.5 acres <br />May Day East to Chief Portal <br />0.8 acres <br />TOTAL AFFECTED OPERATIONAL AREA <br />45.7 acres <br />400 0 2013 400 <br />NORTH <br />Total Operational Area <br />SUNRISE MINING, LLC <br />DATE DESCRIPTION <br />FIGURE D-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.