My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-10-21_PERMIT FILE - M1983090
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M1983090
>
2017-10-21_PERMIT FILE - M1983090
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:31:07 PM
Creation date
10/25/2017 11:00:51 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1983090
IBM Index Class Name
PERMIT FILE
Doc Date
10/21/2017
Doc Name
Adequacy Review Response
From
Bestway Concrete
To
DRMS
Type & Sequence
AM2
Email Name
ECS
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DEERE&AULT CONSULTANTS, INC <br /> JANUARY 31,2011 <br /> Page 2 <br /> I do recognize that we have in the past accepted leak test reports that utilized 1000A of the <br /> precipitation. Honestly, I don't think this was an issue in the pastas the other liners would <br /> have passed regardless of the percentage used; it simply wasn't a cause to delay a liner <br /> approval. However, since we have previously accepted tests utilizing 100% of the <br /> precipitation without comment you had no Way of knowing that utilizing 100% of the <br /> precipitation was not_aoeeptable. Therefore, we*wIff accept the 100% value for this test. <br /> Please be advised that we will no lionger.accept utir'ization of 10Q% Of the precipitation in <br /> gravel pit liner tests <br /> La Poudre Reservoirs Number 3 and Number 4 are accepted as having been lined to <br /> the perfommmnee standard referenced in the August 1999 State Engineer Guidelines for <br /> Lining Criteria for Gravel Pits. Meeting the performance standard requires that A <br /> wafter inflows and outflows for the reservoirs must be accounted for on a weekly <br /> basis. <br /> With this liner approval, La Poudre Reservoirs Number 3 and Number 4 may be used to <br /> store water in accordance with the 1999 SEO Guidelines. Prior to any storage at this site, <br /> the operator will need to coordinate with the District 3 Water Commissioner, currently <br /> George Varra,to review operations and accounting. <br /> If you would like to discuss the matter any further please contact me or Jonathan <br /> Hernandez,at the number on the first page. <br /> Sincerely, <br /> David L. Nettles, P.E. <br /> Division Engineer <br /> ec: George Varm,District 3 Water Commissioner <br /> WDiD(0303010,0303376,0303377) <br />
The URL can be used to link to this page
Your browser does not support the video tag.