My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-10-20_GENERAL DOCUMENTS - M2017036
DRMS
>
Day Forward
>
General Documents
>
Minerals
>
M2017036
>
2017-10-20_GENERAL DOCUMENTS - M2017036
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2021 7:12:13 AM
Creation date
10/24/2017 10:46:15 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2017036
IBM Index Class Name
General Documents
Doc Date
10/20/2017
Doc Name
USACE Comment
From
Department of the Army
To
DRMS
Email Name
JLE
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pre-Construction Notification (PCN) Requirements <br /> 1! <br /> i (Nationwide Permit General Condition No. 32 <br /> from the January 6, 2017 Federal Register) <br /> US Army Corps of Engineers, Omaha District,Denver Regulatory Office <br /> 9307 South Wadsworth Blvd, Littleton, CO 80128 <br /> Phone: (303) 979-4120 <br /> Contents of Pre-Construction Notification: <br /> The PCN must be in writing and include the following information: <br /> (1) Name, address and telephone numbers of the prospective permittee; <br /> (2) Location of the proposed project; <br /> (3) Identify the specific NWP or NWP(s)the prospective permittee want to use to authorize the proposed <br /> activity; <br /> (4) A description of the proposed activity; the activity's purpose; direct and indirect adverse <br /> environmental effects the activity would cause,including the anticipated amount of loss of wetlands,other <br /> special aquatic sites, and other waters expected to result from the NW activity, in acres, linear feet, or <br /> other appropriate unit of measure; a description of any proposed mitigation measures intended to reduce <br /> the adverse environmental effects caused by the proposed activity; and any other NWP(s),regional <br /> general permit(s),or individual permit(s)used or intended to be used to authorize any part of the proposed <br /> project or any related activity,including other separate and distant crossings for linear projects that require <br /> Department of the Army authorization but do not require pre-construction notification.The description of <br /> the proposed activity and any proposed mitigation measures should be sufficiently detailed to allow the <br /> district engineer to determine that the adverse environmental effects of the activity will be no more than <br /> minimal and to determine the need for compensatory mitigation or other mitigation measures. For single <br /> and complete linear projects,the PCN must include the quantity of anticipated losses of wetlands,other <br /> special aquatic sites, and other waters for each single and complete crossing of those wetlands, other <br /> special aquatic sites, and other waters. Sketches should be provided when necessary to show that the <br /> activity complies with the terms of the NWP. (Sketches usually clarify the activity and when provided <br /> results in a quicker decision. Sketches should contain sufficient detail to provide an illustrative description <br /> of the proposed activity(e.g.,a conceptual plan),but do not need to be detailed engineering plans); <br /> (5) The PCN must include a delineation of wetlands, other special aquatic sites, and other waters,such as <br /> lakes and ponds, and perennial,intermittent,and ephemeral streams,on the project site.Wetland <br /> delineations must be prepared in accordance with the current method required by the Corps. The permittee <br /> may ask the Corps to delineate the special aquatic sites and other waters on the project site,but there may <br /> be a delay if the Corps does the delineation, especially if the project site is large or contains many <br /> wetlands, other special aquatic sites, and other waters.Furthermore,the 45 day period will not start until <br /> the delineation has been submitted to or completed by the Corps,as appropriate; <br /> (6) If the proposed activity will result in the loss of greater than 1/10-acre of wetlands and a PCN is <br /> required,the prospective permittee must submit a statement describing how the mitigation requirement <br /> will be satisfied,or explaining why the adverse environmental effects are no more than minimal and why <br /> compensatory mitigation should not be required.As an alternative,the prospective permittee may submit a <br /> conceptual or detailed mitigation plan. <br /> (7) For non-Federal permittees,if any listed species or designated critical habitat might be affected or is <br /> in the vicinity of the activity, or if the activity is located in designated critical habitat,the PCN must <br />
The URL can be used to link to this page
Your browser does not support the video tag.