My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-10-23_GENERAL DOCUMENTS - C1980007
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1980007
>
2017-10-23_GENERAL DOCUMENTS - C1980007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2017 7:12:12 AM
Creation date
10/24/2017 6:56:38 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
General Documents
Doc Date
10/23/2017
Doc Name
Compliant and Request for Inspection Over Failure of West Elk
From
Wild Earth Gurdians
To
DRMS
Permit Index Doc Type
General Correspondence
Email Name
MPB
JRS
LDS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
source completed all initial approval permit condition requirements within the timeframes required, and was <br />issued a Final Approval Authorization letter on December 2, 2014 in lieu of being issued a new Final Approval <br />permit. The letter authorizes continued operation under the terms and conditions of the Initial Approval permit <br />and demonstrates that the self -certification process is complete. MCC submitted a cancellation notice for this <br />point on 10/26/2015, as this unit is no longer APEN/Permit required following the removal of the "NSPS <br />Catchall" requirements from AQCC Regulations in 2014. The following compliance determinations are included <br />below because the permit was in effect at the time of the inspection. <br />REQUIREMENTS TO SELF -CERTIFY FOR FINAL APPROVAL <br />1. YOU MUST notify the Air Pollution Control Division (the Division) no later than fifteen days after <br />commencement of the permitted operation or activity by submitting a Notice of Startup form to the <br />Division. The Notice of Startup form may be downloaded online at <br />www.cdphe.state.co.us/ap/downloadforms.html. Failure to notify the Division of startup of the permitted <br />source is a violation of Air Quality Control Commission (AQCC) Regulation No. 3, Part B, Section III.G.1 <br />and can result in the revocation of the permit. <br />This engine began operation in 2010 and was noted during the 2012 inspection as needing an APEN <br />and permit. The source submitted a NOS on 10/7/2013 (date of permit issuance), and is considered in <br />compliance with this condition. <br />2. Within sixty (60) days after issuance of this permit, compliance with the conditions contained on this permit <br />shall be demonstrated to the Division. It is the permittee's responsibility to self certify compliance with the <br />conditions. Failure to demonstrate compliance within 180 days may result in revocation of the permit or <br />enforcement action by the Division. Information on how to certify compliance was mailed with the permit <br />or can be obtained from the Division. (Reference: Regulation No. 3, Part B, II.G.2) <br />This condition should provide the source with 180 days to self certify, rather than listing 60 days in <br />the first sentence. The source completed all self certification requirements within 180 days after <br />issuance of this permit as required. Source is in compliance. <br />3. This permit shall expire if the owner or operator of the source for which this permit was issued: (i) does not <br />commence construction/modification or operation of this source within 18 months after either, the date of <br />issuance of this construction permit or the date on which such construction or activity was scheduled to <br />commence as set forth in the permit application associated with this permit; (ii) discontinues construction <br />for a period of eighteen months or more; (iii) does not complete construction within a reasonable time of <br />the estimated completion date. The Division may grant extensions of the deadline per Regulation No. 3, <br />Part B, III.F.4.b. (Reference: Regulation No. 3, Part B, III.F.4.) <br />The unit was constructed prior to permit issuance. Violations associated with this issue were <br />addressed during the 2012 inspection. Source is in compliance with this condition. <br />4. Within sixty (60) days after issuance of this permit, the operator shall complete all initial compliance testing <br />and sampling as required in this permit and submit the results to the Division as part of the self -certification <br />process. (Reference: Regulation No. 3, Part B, Section III.E.) <br />The source completed the required initial EPA Method 9 reading within 60 days after issuance of the <br />permit. Source is in compliance with this condition. <br />5. Within sixty (60) days after issuance of this permit, the AIRS ID number shall be marked on the subject <br />equipment for ease of identification. (Reference: Regulation No. 3, Part B, III.E.) (State only enforceable) <br />The source reported marking the AIRS ID as required during self -certification. This point was not <br />observed during the inspection. Without evidence to suggest the contrary, the source is in compliance <br />with this condition. <br />2015 Inspection �� <br />0510015-INSP-2015 Page 28 of 37 <br />
The URL can be used to link to this page
Your browser does not support the video tag.