My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-10-23_GENERAL DOCUMENTS - C1980007
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1980007
>
2017-10-23_GENERAL DOCUMENTS - C1980007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2017 7:12:12 AM
Creation date
10/24/2017 6:56:38 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
General Documents
Doc Date
10/23/2017
Doc Name
Compliant and Request for Inspection Over Failure of West Elk
From
Wild Earth Gurdians
To
DRMS
Permit Index Doc Type
General Correspondence
Email Name
MPB
JRS
LDS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OPERATING & MAINTENANCE REQUIREMENTS <br />5. The owner or operator shall develop an operating and maintenance (O&M) plan, along with a recordkeeping <br />format, that outlines how the applicant will maintain compliance on an ongoing basis with the requirements <br />of this permit. Compliance with the O&M plan shall commence at startup. Within sixty (60) days after <br />issuance of this permit, the owner or operator shall submit the O&M plan to the Division. Failure to submit <br />an acceptable operating and maintenance plan could result in revocation of the permit. (Reference: <br />Regulation No. 3, Part B, III.E.) <br />This point was not reported or permitted prior to being noted during the 2012 inspection. The <br />source reported that they have always had an O&M procedure, but formally submitted this plan <br />following Initial Approval Permit issuance. The O&M Plan was approved on March 6, 2014 and <br />the source has maintained all maintenance and inspection records as required. The source also <br />created a detailed recordkeeping format that includes all appropriate monthly and yearly <br />throughput and emissions tracking information. The source is in compliance with this condition. <br />COMPLIANCE TESTING AND SAMPLING <br />Initial Testing Requirements <br />6. Within sixty (60) days after issuance of this permit, the owner or operator shall demonstrate compliance <br />with Conditionl0, using EPA Method 9 to measure opacity from the Rock Dust Silo and the baghouse. <br />Sources not Subject to opacity readings of an NSPS subpart: <br />This measurement shall consist of a minimum twenty-four consecutive readings taken at fifteen second <br />intervals over a six minute period. (Reference: Regulation No. 1, Section II.A.1 & 4) <br />The source conducted initial EPA Method 9 observations as part of the Initial Approval permit <br />requirements, prior to issuance of this Final Approval permit. Source is in compliance. <br />ADDITIONAL REQUIREMENTS <br />The AIRS ID number shall be marked on the subject equipment for ease of identification. (Reference: <br />Regulation No. 3, Part B, III.E.) (State only enforceable) <br />The AIRS ID number is marked on the silo as required. Source is in compliance. <br />A Revised Air Pollutant Emission Notice (APEN) shall be filed: (Reference: Regulation No. 3, Part A, <br />Section II.C.) <br />Annually whenever a significant increase in emissions occurs as follows: <br />For any criteria pollutant: <br />For sources emitting less than 100 tons per year, a change in actual emissions of five tons per <br />year or more, above the level reported on the last APEN submitted; or <br />For volatile organic compounds (VOC) and nitrogen oxide (NOx) sources in an ozone non - <br />attainment area emitting less than 100 tons of VOC or nitrogen oxide per year, a change in actual <br />2015 Inspection �� <br />0510015-INSP-2015 Page 26 of 37 <br />
The URL can be used to link to this page
Your browser does not support the video tag.