Laserfiche WebLink
Facility <br />AIRS <br />AIRS <br />Controlled <br />Emission <br />Equipment <br />point <br />PM <br />PMIo <br />PM2s <br />NO, <br />SO2 <br />VOC <br />CO <br />yp <br />Type <br />ID <br />Rock Dust <br />PM, PM 10, <br />Rock Dust <br />022 <br />0.1 <br />0.05 <br />0.05 <br />-- <br />-- <br />-- <br />-- <br />Point <br />Silo <br />See "Notes to Permit Holder 43 "for information on emission factors and methods used to calculate limits. <br />During the first twelve (12) months of operation, compliance with both the monthly and yearly emission <br />limitations shall be required. After the first twelve (12) months of operation, compliance with only the <br />yearly limitation shall be required. <br />Compliance with the annual limits shall be determined by recording the facility's annual emissions for the <br />pollutants listed in the table above on a rolling twelve (12) month total. By the end of each month a new <br />twelve-month total shall be calculated based on the previous twelve months' data. The permit holder shall <br />calculate monthly emissions and keep a compliance record on site, or at a local field office with site <br />responsibility, for Division review. <br />The source accurately tracks emissions on a monthly and rolling 12 -month total using the emission <br />factor in the Notes to Permit Holder section of the permit. The facility maintained compliance with <br />the monthly limits during the first year following permit issuance, and operated in compliance with <br />the rolling 12 -month total during the compliance period (see attached records). The highest <br />reported rolling 12 -month total PM, PMio, and PM2.5 emissions for this point occurred during the <br />period ending March 2014, with 0.76 tpy, 0.042 tpy, and 0.042 tpy respectively. The source is in <br />compliance with this condition. <br />2. The following control equipment shall be maintained and operated to achieve the control <br />efficiencies listed below. The owner or operator shall monitor compliance with this condition through the <br />results of approved compliance tests (when required), compliance with the Operating and Maintenance <br />Plan, compliance records, and other methods as approved by the Division. (Reference: Regulation No. 3, <br />Part B, Section III.E.) <br />Facility <br />AIRS <br />Controlled <br />Control <br />Equipment <br />Control Device <br />Point <br />Pollutants <br />Efficiency <br />ID <br />Rock Dust <br />PM, PM 10, <br />022 <br />Baghouse <br />99.9% <br />Silo <br />PM2.5 <br />The source operates and maintains the silo and baghouse according to the requirements of the <br />approved 2014 O&M Plan as required. Weekly and monthly silo baghouse maintenance and <br />inspection records were provided and reviewed as part of this inspection. Maintenance personnel <br />appeared to accurately record when preventative or corrective maintenance was conducted, as <br />required. According to source records, bags were replaced on 5/7/2015. Without evidence to suggest <br />the contrary, the source is in compliance with this condition. <br />PROCESS LIMITATIONS AND RECORDS <br />This source shall be limited to the following maximum consumption, processing and/or operational rates <br />as listed below. Monthly and Annual records of the actual process rate shall be maintained by the <br />2015 Inspection Iff <br />0510015-INSP-2015 Page 24 of 37 <br />