My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-10-23_GENERAL DOCUMENTS - C1980007
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1980007
>
2017-10-23_GENERAL DOCUMENTS - C1980007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2017 7:12:12 AM
Creation date
10/24/2017 6:56:38 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
General Documents
Doc Date
10/23/2017
Doc Name
Compliant and Request for Inspection Over Failure of West Elk
From
Wild Earth Gurdians
To
DRMS
Permit Index Doc Type
General Correspondence
Email Name
MPB
JRS
LDS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Permit Number 10GU1130 — AIRS Pt 021. Diesel -fired emergency backup generator to power the Shaft #2 <br />ventilation fan. The Initial Approval version of this permit was issued on March 24, 2010. The source completed <br />all initial approval permit condition requirements within the timeframes required, and these conditions were <br />addressed during the 2012 inspection. The source was issued a Final Approval version of the permit (Permit <br />IOGU1130 Issuance 2) on February 10, 2016. However, because the initial approval version was in effect at the <br />time of the inspection, that permit is used below for compliance determination purposes. There were no <br />substantial changes in the final version besides the removal of initial approval requirements. <br />1. This permit shall expire if the owner or operator of the source for which this permit was issued: (i) does <br />not commence construction/modification or operation of this source within 18 months after either the date <br />of issuance of this initial approval permit or the date on which such construction or activity was scheduled <br />to commence as set forth in the permit application associated with this permit; (ii) discontinues <br />construction for a period of eighteen months or more; or (iii) does not complete construction within a <br />reasonable time of the estimated completion date (See General Condition No. 6., Item 1.). Upon a <br />showing of good cause by the permittee, the Division may grant extensions of the permit. (Reference: <br />Regulation No. 3, Part B, Section III.F.4.) <br />According to the submitted Notice of Startup, the source began operating this unit on 4/5/2010, <br />shortly after permit issuance. Source is in compliance. <br />2. Within one hundred and eighty days (180) after commencement of operation, compliance with the <br />conditions contained on this permit shall be demonstrated to the Division. It is the permittee's <br />responsibility to self certify compliance with the conditions. Failure to demonstrate compliance within <br />180 days may result in revocation of the permit. (Information on how to certify compliance was mailed <br />with the permit.) <br />Appropriate self certification documents were received on 8/31/2010, within 180 days after <br />commencement of operation. Source is in compliance. <br />3. AIRS Point ID numbers (for example, "AIRS PT ID: 051/0015/021") shall be marked on the subject <br />equipment for ease of identification. (Reference: Regulation No. 3, Part B, Section III.E.) (State only <br />enforceable) <br />The AIRS Point ID is appropriately marked on the door of the unit. Source is in compliance. <br />4. Visible emissions shall not exceed twenty percent (20%) opacity during normal operation of the source. <br />During periods of startup, process modification, or adjustment of control equipment visible emissions <br />shall not exceed 30% opacity for more than six minutes in any sixty consecutive minutes. Opacity shall be <br />measured by EPA Method 9. (Reference: Regulation No. 1, Section II.A.1. & 4.) <br />The unit was not operating at the time of the inspection, and thus no visible emissions were <br />observed. Facility personnel reported that the unit does not smoke when operating. Without <br />evidence to suggest the contrary, the source is in compliance with this condition. <br />5. This source is subject to the odor requirements of Regulation No. 2. (State only enforceable) <br />No odors were observed during the inspection. Source is in compliance. <br />2015 Inspection Q <br />0510015-INSP-2015 Page 19 of 37 <br />
The URL can be used to link to this page
Your browser does not support the video tag.