My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-10-23_GENERAL DOCUMENTS - C1980007
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1980007
>
2017-10-23_GENERAL DOCUMENTS - C1980007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2017 7:12:12 AM
Creation date
10/24/2017 6:56:38 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
General Documents
Doc Date
10/23/2017
Doc Name
Compliant and Request for Inspection Over Failure of West Elk
From
Wild Earth Gurdians
To
DRMS
Permit Index Doc Type
General Correspondence
Email Name
MPB
JRS
LDS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6. This source shall be limited to a maximum production rate as listed below and all other activities, <br />operational rates and numbers of equipment as stated in the application. Daily records of the actual <br />production rate shall be maintained by the applicant and made available to the Division for inspection <br />upon request. (Reference: Regulation No. 3, Part B, Section II.A.4.) <br />Total quantity of material (coal and refuse) handled shall not exceed 59,400 tons per day and <br />8,500,000 tons per year. <br />The total quantity of refuse material shall not exceed 5,000 tons per day from the Coal Prep Plant <br />or 5,000 tons per day from the Reclaim Tower and 1,000,000 tons per year. <br />Raw material stockpiles shall not exceed 5.1 acres. <br />Processed material stockpiles shall not exceed 4.8 acres. <br />Processing of through the Coal Prep Plant shall not exceed 20,000 tons per day and 4,500,000 ton <br />per year. <br />Hours of operation for maintenance activities on the three main stockpiles limited to 60 hours/day <br />Hours of operation for maintenance activities on the silo stockpiles limited to 40 hours/day <br />Hours of operation for maintenance activities on the refuse piles limited to 75 hours/day <br />After the inspection, the source provided facility records to demonstrate compliance with this <br />Condition (see attached). Records were reviewed for the time period from the previous inspection <br />(Sept 2012) through April 2015. The following includes a summary of those production records <br />with associated analysis for each permit limit as listed above: <br />Total material handled- The facility did not exceed the daily material handling limit of 59,400 tpd, <br />with the highest recorded value being 51,543 tons (2/16/2014). Since the last inspection, yearly <br />production has remained fairly consistent around 6 MMtpy during the compliance period. The <br />highest rolling 12 -month total production of 7,216,010 tons produced occurred during the 12 -month <br />period ending Nov 2012. This is below the 8,500,000 tpy limit listed above. <br />Total quantity of refuse material- The facility has not exceeded the daily refuse material production <br />limits of 5,000 tpd, with the highest coal prep plant refuse material daily throughput of 4,133 tpd <br />occurring on 3/14/2013. Since the last inspection, the highest 12 -month rolling total of refuse material <br />throughput at this point was 323,297 tpy during the 12 -month rolling periods ending Aug 2013 <br />through Nov 2013. This value is below the 1,000,000 tpy limit listed above. <br />Raw material stockpiles have not exceeded 5.1 acres. This is the maximum area of the stockpiles, <br />which are landlocked between the mountainside and an access road. <br />Processed material stockpiles have not exceeded 4.8 acres. This is the maximum area of the <br />stockpiles, which are landlocked between the mountainside and an access road. <br />Processing through the Coal Prep Plant- The facility has not exceeded the CPP processing limits of <br />20,000 tpd or 4,500,000 tpy. The highest daily processing rate of 19,025 tpd occurred on 1/7/2015. <br />The source maintains records of coal prep plant processing on a rolling 12 -month total, with the <br />highest throughput of 2,164,160 tpy occurring during the 12 -month period ending Sept 2012. <br />2015 Inspection hV <br />0510015-INSP-2015 Page 11 of 37 <br />
The URL can be used to link to this page
Your browser does not support the video tag.