Laserfiche WebLink
All improperly cured or otherwise defective mortar shall be removed and replaced by the Contractor at his <br /> expense. <br /> PART 3-EXECUTION <br /> 3.01 FORMS <br /> The concrete forms shall be constructed to the lines and dimensions as shown on the detailed drawings and <br /> shall be of acceptable material and adequately braced and tied to support all of the loads and pressures of <br /> the wet concrete without distortion or leaks,and which will produce a smooth,even surface. <br /> The form facing material shall produce a smooth,hard,uniform texture on the concrete. It may be <br /> plywood,tempered concrete-form-grade hardboard,metal,plastic,paper,or other approved material <br /> capable of producing the desired finish. The arrangement of the facing material shall be orderly and <br /> symmetrical,with the number of seams kept to the practical minimum. It shall be supported by studs or <br /> other backing capable of preventing excessive deflection. Material with raised grain,torn surfaces,worn <br /> edges,patches,dents,or other defects which will impair the texture of the concrete shall not be used. Tie <br /> holes and defects shall be patched. All fins shall be completely removed. All exposed concrete corners <br /> shall be chamfered 3/4". <br /> A water tight form tie with a neoprene seal shall be used on all walls or slabs that form a water holding <br /> space. Ties in these walls or slabs shall remain permanently in the concrete. <br /> Drawings showing the general design and dimensions for forms for structures need not be submitted to the <br /> Engineer for acceptance unless the Engineer so requests such submittal. Design and construction shall be <br /> in accordance with"Recommended Practice for Concrete Formwork"(ACI 347),and"Formwork"(ACI <br /> 301,Chapter 4). <br /> Before concrete is placed,the surface of the forms shall be oiled with a commercial form oil that will <br /> effectively prevent sticking of the concrete to the forms and will not stain the concrete. All bond breaking <br /> materials or processes shall be used only after acceptance by the Engineer. Care shall be taken in applying <br /> form oil to avoid contact with reinforcement steel. Embedded material which becomes coated with form <br /> oil shall be thoroughly cleaned or replaced at the expense of the Contractor. Supporting forms and shores <br /> shall not be removed from beams,floors,and walls until these structural units are strong enough to support <br /> their own weight and any approved superimposed load which at no time shall exceed the design live load. <br /> When the forms are stripped,there shall be no excessive deflection or distortion and no evidence of damage <br /> to the concrete,due either to removal of support or the stripping operation. Removal time of forms,shall <br /> be determined by the Engineer. <br /> 3.02 PLACEMENT <br /> Prior to placing the concrete,the Contractor shall remove all trash,pieces of wood,standing water,or other <br /> debris,and shall dampen areas on which concrete is to be placed. <br /> Placement shall conform to ACI 301,Chapter 8"Placing,"ACI 306"Recommended Practice for Cold <br /> Weather Concreting,"and ACI 305"Recommended Practice for Hot Weather Concreting." No concrete <br /> shall be placed until all formwork,reinforcement,installation of parts to be embedded,bracing of forms, <br /> and preparation of surfaces involved in the placing have been approved by the Engineer. No concrete shall <br /> be placed in water,except with the written permission of the Engineer;the method of depositing the <br /> concrete shall be subject to his approval. All surfaces of forms and embedded materials that have become <br /> encrusted with dried mortar or grout from concrete previously placed shall be cleaned of all such mortar or <br /> grout before the surrounding or adjacent concrete is placed. Immediately before placing concrete,all <br /> surfaces upon or against which the concrete is to be placed shall be free from standing water,mud,debris, <br /> or loose materials. The surfaces of absorptive materials against or upon which concrete is placed shall be <br /> moistened thoroughly so that moisture will not be drawn from the freshly placed concrete. The concrete <br /> 9/17 Section 03310-Page 5 of 8 <br />