Laserfiche WebLink
Bulldozer Worksheet Cont'd Task # 001 Page 2 of 2 <br />Job efficiency: <br />0.83C <br />Spoil pile: <br />1.000 <br />Push gradient: <br />0.903 <br />Altitude: <br />0.93C <br />Material Weight: <br />1.438 <br />Blade type: <br />1.000 <br />Net correction: 0.9021 <br />Adjusted unit production: 2,589.30 LCY/hr <br />Adjusted fleet production: 2589.3 LCY/hr <br />JOB TIME AND COST <br />Fleet size: 1 Dozer(s) <br />Unit cost: $0.187/LCY <br />Total job time: 1.54 Hours <br />Total job cost: $748 <br />(1 SHIFT/DAY) <br />(DOZ-OC) <br />(CAT HB) <br />(CAT HB) <br />(CAT HB) <br />(PAT) <br />