Laserfiche WebLink
Huddleston -Berry <br />' Engineering& Tcs ing, LLC <br />Project No.: 01349 - <br />Project Name: Bowie Mine <br />Client Name: Bowie Resources <br />Placement Contractor: Bowie Resources <br />Contractor Representative: <br />0001 <br />Ron <br />Task: Gob Pile Densities <br />SOIL COMPACTION TEST REPORT <br />Field vs. Lab Densities <br />Tested By: MS Date: 9/13/17 <br />Work Order No: 48022 <br />Authorized By: Client Date: 9/12/17 <br />Reviewed By: MAB Date: 10/11/17 <br />No. <br />Point NO. <br />Elevation <br />Max. Dry <br />Density c <br />tY (p <br />Optimum <br />Moisture / <br />(%) <br />Wet <br />Density c <br />ty (p <br />Speedy <br />Moisture / <br />(%) <br />Field Dry <br />Density c <br />ty (p f) <br />Relative <br />Field <br />Tare Weight <br />(g) <br />Wet Weight <br />(g) <br />Dry Weight <br />(g) <br />Lab Dry <br />Density <br />(pct) <br />Lab <br />Moisture ( ) <br />Relative <br />Lab <br />Comp.( /o) <br />16 <br />409 <br />5885.8 <br />95.5 <br />14.0 <br />104.0 <br />- <br />- <br />- <br />196.7 <br />874.4 <br />800.1 <br />92.6 <br />12.3% <br />97% <br />27 <br />Remarks: <br />Gauge Number: 2472 Density Counts: 2918 Moisture Counts: 388 <br />Record No. 27 S <br />2f <br />