Laserfiche WebLink
L-1 <br />Soil and Vegetation Inventory & Revegetation Report <br />L-2 <br />Soils Map <br />L-3 <br />Vegetation Map (archived) <br />L-4 <br />Revegetation Research Report <br />L-5 <br />Vegetation Map with Sampling Locations <br />M-1 Existing Surface Features Map <br />N-1 through <br />N-3 Site Plan Drawings <br />N-4 Site Development Drawing <br />N-5 Topsoil Piles - Location Map (archived) <br />N-6 through <br />N-9 Paved Access Road Drawings <br />N-10 Access Road - Profile and Typical Cross -Section <br />N -10a Light Duty Road - Typical Cross -Section <br />0-1 <br />Office and Shop Plans <br />0-2 <br />Office and Shop Elevations <br />O -A1 <br />New Addition - Site Plan <br />O -A2 <br />New Addition - Elevation <br />P-1 and <br />R-2 <br />P-2 <br />Electrical Distribution Line Drawings <br />P-3 <br />"Letter of Understanding" (05/28/93) <br />Q-1 <br />Reclamation Contour and Drainage Plan Map (Final) <br />Q -la <br />Topographic Map - Original Drainage <br />Q-3 <br />Pre Mining Contours <br />R-1 <br />TR #31 - <br />Coal Supply Change <br />R-2 <br />MR #28 <br />- Coal Supply Testing <br />R-3 <br />MR #32 <br />- Coal Testing & Temporary Coal Supply <br />R-4 <br />MR #34 <br />- Mine Waste Rock Addition <br />R-5 <br />MR #38 <br />— Additions to the Reclamation Plan <br />R-6 <br />TR #34 — <br />Final Contour Modification Across Long Term Spoil <br />R-7 <br />TR #35 — <br />Change of Coal Supply/Source of Ash <br />R-8 <br />MR #40 <br />— Variance from Contemporaneous Reclamation <br />R-9 <br />TR #36 — <br />Change Approved Post -Mining Land Use — Partial (1) <br />R-10 <br />MR #42 <br />— Revisions to Weed Management <br />R-11 <br />TR #37 — <br />Modification to Revegetation Success Standards <br />R-12 <br />TR #38 — <br />Change Approved Post -Mining Land Use — Partial (2) <br />08/17 <br />