My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-10-05_PERMIT FILE - M2017049 (47)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2017049
>
2017-10-05_PERMIT FILE - M2017049 (47)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/5/2021 5:26:19 AM
Creation date
10/16/2017 2:50:55 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2017049
IBM Index Class Name
Permit File
Doc Date
10/5/2017
Doc Name Note
Volumes I through IV, Part 7 of 10
Doc Name
Application
From
Transit Mix Concrete Co.
To
DRMS
Permit Index Doc Type
Application Materials
Email Name
AME
WHE
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
190
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NORWEST <br /> COR PORAT ION <br /> Conclusions <br /> Highway 115 is located within 200 feet of the proposed Hitch Rack Ranch Quarry permit boundary. The <br /> road will be impacted by construction of acceleration and deceleration lanes, but all construction will be <br /> permitted with CDOT, completed in cooperation with CDOT, and will occur within the Highway 115 <br /> right-of-way. There will be a temporary impact to Highway 115 while the acceleration and deceleration <br /> lanes are constructed, and the impacts will be similar to other road widening construction projects. <br /> Once the road construction is finished, Highway 115 will have acceleration and deceleration lanes and <br /> better sight lines. Thus,construction of the access road and intersection will improve the safety and use <br /> of Highway 115, and the highway will not be adversely impacted. <br /> Engineer Certification <br /> This engineering evaluation demonstrates that by following MOT guidelines and permit requirements, <br /> Highway 115 will not be adversely impacted by construction of the quarry access road. <br /> 0 L ICJ. <br /> � 4 8 <br /> 01 <br /> �ss�4NAt E�G\� <br /> Hitch Rack Ranch Quarry Amendment Exhibit T <br /> October 3,2017 <br /> S-4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.