ri <br /> Transit Mix Concrete Co. <br /> and does not actually exist at the mapped location. However, it has been included in the impact <br /> evaluation, and the projected drawdown at that location is between 5 and 10 feet. Transit Mix is <br /> in the process of securing the necessary groundwater permits and Substitute Water Supply Plan <br /> to mitigate any negative productivity impacts to these wells. <br /> Hitch Rack Ranch Quarry Permit Application <br /> October 3,2017 G-39 <br />