All ran sit it Mix Concrete Co. <br /> o a s <br /> Table G-7 <br /> Culvert Summary <br /> Watershed 100-yr, 24-hr HW/D Culvert <br /> Name Structure Type Area Peak Flow Ratio Diameter <br /> (ac) (cfs) (in) <br /> LTC-CC-2 Culvert 46.87 100.3 1.15 42 (2) <br /> LTC-CC-3 Culvert 26.23 67.9 1.30 42 <br /> LTC-CC-4 Culvert 113.98 147.4 0.96 42 (3) <br /> LTC-CC-5 Culvert 157.46 321.6 0.91 72 (2) <br /> LTC-CC-6 Culvert 4632 1787 0.98 96 (5) <br /> P-Plant-1-CC-1 Basin Outlet NA NA NA 18 <br /> P-Plant-2-CC-1 Basin Outlet NA NA NA 18 <br /> P-F1-CC-1 Basin Outlet NA NA NA 18 <br /> RD-SP-1-CC-1 Basin Outlet NA NA NA 18 <br /> RD-CC-1 Road Culvert 2.57 11.4 0.92 24 <br /> RD-SP-2-CC-1 Basin Outlet NA NA NA 18 <br /> RD-CC-2 Road Culvert 3.31 12.1 0.95 24 <br /> RD-SP-CC-3 Basin Outlet NA NA NA 18 <br /> RD-CC-3 Road Culvert 1.72 6.9 1.02 18 <br /> RD-SP-CC-4 Basin Outlet NA NA NA 18 <br /> RD-CC-4 Road Culvert 10.6 34.6 0.96 36 <br /> The culvert crossing of Little Turkey Creek will be located along the current creek alignment and <br /> will match the existing channel grade. The length of the culverts to be installed will be minimized <br /> to reduce the area of the channel that will be affected. Figure G-17 shows the profile and cross- <br /> section for the Little Turkey Creek crossing. <br /> The sediment detention basin outlets will be CMP culverts. These culverts will need to be <br /> excavated through the unmined blocks of bedrock to allow the pipes to be placed at grade. <br /> Therefore, a notch will be excavated to allow the installation of the culverts based on the <br /> maximum depth required for drainage over the life of the pit development. These areas will then <br /> be filled to ensure the affected area drainage is detained prior to release. For reclamation, the <br /> fill will be removed and the bedrock cut exposed to allow a positive drainage from the reclaimed <br /> pit areas. <br /> Hitch Rack Ranch Quarry Permit Application <br /> October 3,2017 G-25 <br />