a sTr n it Mix Concrete Co. <br /> o <br /> Table G-5 <br /> Ditch Summary <br /> Bottom � <br /> 100-hr 24-hr Channel <br /> Name Width Sideslope Slope Peak Flow Depth Riprap Dso <br /> ft (H:V) (%) cfs ft (in) <br /> Phases I -V <br /> Access Road <br /> Ditches AR-1 thru 2 or 4 3:1 Up to 8% Up to 45.6 cfs 2.0 2 to 15 <br /> 10 <br /> CWD-1 6 1:1 0.5-45% 95-120 0.63-2.7 MegaDitch <br /> CWD-4 4 3:1 8% 12.2 1.0 4 <br /> CWD-5 4 3:1 8% 20.4 1.1 6 <br /> CWD-6 4 3:1 2.9% 83.3 2.0 8 <br /> CWD-7 4 3:1 4% 46.8 1.6 8 <br /> DD-1 4 3:1 1.2% 95 1.8 8 <br /> DD-2 4 3:1 1.0% 21.1 0.8 Bedrock <br /> DD-3 4 3:1 1-10.6% 114.1 1.15-2.1 Bedrock <br /> DD-4 4 3:1/5:1 1-10.6% 203 1.5-2.6 Bedrock <br /> DD-5 4-10 3:1/5:1 1.0-5.0% 82 0.8-1.7 Bedrock <br /> DD-6 4 3:1 0.5-1% 14.9 0.74-0.89 2 <br /> DD-7 4 3:1 1-8% 43.6 0.75-1.28 9 <br /> DD-8 4/10 3:1/5:1 1-5% 162 1.1-2.4 Bedrock <br /> Phase Reclaim <br /> F1-1 8 3:1 1.0% 188.03 2.4 5 <br /> F2-1 4 3:1 8.0% 27.3 0.59 8 <br /> F2-2 8 3:1 20.0% 121 0.75 18 <br /> F3-1 4 3:1 2.0% 89.4 1.53 8 <br /> b. Sediment Detention Basins <br /> Down drain and road ditches discharge to sediment detention basins, and these basins are <br /> designed to contain runoff from the 100-yr, 24-hr storm event. Where possible, sediment <br /> detention basins are located within the pit and other area of disturbance to minimize the affected <br /> land boundary. Norwest determined runoff volumes using the same design criteria (curve <br /> numbers and routing) as the ditches. A key element of the stormwater management plan is <br /> maintaining a high available sediment capacity in the sediment detention basins, and Norwest <br /> designed the basins to have minimum capacities of the runoff volume plus 20% for sediment <br /> Hitch Rack Ranch Quarry Permit Application <br /> October 3,2017 G-22 <br />