Laserfiche WebLink
F <br /> � Transit Mix Concrete Co. <br /> L+ <br /> JF <br /> y <br /> a <br /> G <br /> YAK-yb•'.'i .2 `1L <br /> 2 <br /> ? <br /> w <br /> Y <br /> - <br /> r <br /> a - <br /> st � <br /> Figure G-213 <br /> LTC-2 Surface Water Monitoring Station, July 25, 2017 <br /> Instantaneous streamflow measurements are summarized in Table G-1. Due to dry conditions <br /> at LTC-1 during the November 16, 2015 visit, streamflow was measured approximately 1/3 of a <br /> mile upstream where flow was present. Streamflow was also measured on April 12, 2016 and <br /> June 22, 2016 at the upstream location. The transducer was moved to this upstream location on <br /> April 14, 2016 due to the Glen Carin headgate located immediately downstream from the original <br /> LTC-1 location having work done to it resulting in ponding at the location. <br /> Hitch Rack Ranch Quarry Permit Application <br /> October 3, 2017 G-8 <br />