My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-10-05_PERMIT FILE - M2017049 (41)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2017049
>
2017-10-05_PERMIT FILE - M2017049 (41)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/5/2021 5:25:44 AM
Creation date
10/16/2017 1:38:51 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2017049
IBM Index Class Name
Permit File
Doc Date
10/5/2017
Doc Name Note
Volumes I through IV, Part 1 of 10
Doc Name
Application
From
Transit Mix Concrete Co.
To
DRMS
Permit Index Doc Type
Application Materials
Email Name
AME
WHE
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
190
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ilok DuorYa <br /> 4 <br /> ;rnmma CniJxd Stcxx} <br /> t <br /> L <br /> X <br /> T Bull F:�yk»act <br /> Pnnxr-Nla.nnz <br /> C.;,and B-o . <br /> FIGURE 2: Typical Drill Hole Profile Shown as Loaded With Explosives <br /> Signage— <br /> Blast notification signs will be placed at the entrance to Hitch Rack Ranch Quarry and <br /> along Little Turkey Creek Road to notify the customers, as well as the neighbors, of the <br /> blast schedule. This will require 3 signs in total. Each sign will state whether there is a <br /> blast scheduled for the day or not. If there is a blast scheduled,the sign will also display <br /> the time the blast is scheduled for. These signs will also communicate the blasting <br /> audible signal guide including length of audible signal relating to the timeline before or <br /> after the blast. <br /> Communication— <br /> On the day of the blast,the scheduled blast time will be communicated to all personnel <br /> onsite. Scale house and reception personnel will inform customers, visitors, and vendors <br /> of the scheduled blast time and times when they are expected to leave the mining area. <br /> The primary notification regarding planned dates and times for blasting will be signs at <br /> each entrance to the property. Information on these signs will be posted 24 hours ahead <br /> of a planned blast and will be updated regarding time as necessary thereafter. Transit <br /> Mix Concrete Co. will notify emergency service providers on the day of the blast and <br /> attempt to coordinate with emergency service providers so that emergency vehicles can <br /> pass through the quarry area unimpeded. As the quarry operation develops, Transit Mix <br /> Concrete Co. will make good faith efforts to provide further notification of blast <br /> schedules to those in the immediate vicinity of the quarry. <br /> Blast Area Clearing and Firing Procedures— <br /> Prior to a blast being initiated, all Hitch Rack Ranch Quarry personnel,visitors, vendors, <br /> and customers will be: <br /> • Removed from the mining,plant, and shop areas and stationed at the scale <br /> house/office building. <br />
The URL can be used to link to this page
Your browser does not support the video tag.