My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-10-11_REVISION - C1981041
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981041
>
2017-10-11_REVISION - C1981041
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/12/2017 12:04:29 PM
Creation date
10/12/2017 6:26:38 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981041
IBM Index Class Name
Revision
Doc Date
10/11/2017
Doc Name
Adequacy Review - Preliminary
From
DRMS
To
Snowcap Coal Company
Type & Sequence
RN7
Email Name
JHB
JRS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Rolling Resistance — Road Conditions <br />Haul: Firm, smooth, rolling, dirt/It. surfaced, watered, maintained 3.0 <br />Return: Firm, smooth, rolling, dirt/It. surfaced, watered, maintained 3.0 <br />Haul and Return Time <br />Length Grade Res. <br />Rolling <br />Total Res. Travel Time <br />Source <br />(feet) (%) <br />Res. (%) <br />(%) (minutes) <br />Haul Route: 150 3.00 <br />3.00 <br />6.00 0.1164 <br />(Cat HB) <br />Return Route: 150 -3.00 <br />3.00 <br />0.00 0.0527 <br />(Cat HB) <br />Total Travel Time: 0.1692 minutes <br />Total Cycle Time: 0.5792 minutes <br />Load Bucket Canaci <br />Rated Capacity: 1.80 LCY (heaped) <br />Bucket Fill Factor: 0.975 Loose material - mixed moist aggregates (95-100%) 0.975 <br />Adjusted Capacity: 1.76 LCY <br />Job Condition Correction Factors <br />Site Altitude: 5100 feet <br />Source <br />Altitude Adj: 0.95 (CAT HB) <br />Job Efficiency: 0.83 (1 shift/day) <br />Net Correction: 0.79 multiplier <br />Unadjusted Hourly Unit Production: 181.82 LCY/Hour <br />Adjusted Hourly Unit Production: 143.36 LCY/Hour <br />Adjusted Hourly Fleet Production: 143.36 LCY/Hour <br />JOB TIME AND COST <br />Fleet size: 1 <br />Loader(s) Total job time <br />2.83 Hours <br />Unit cost: $0.535 /LCY Total job cost: $217 <br />
The URL can be used to link to this page
Your browser does not support the video tag.