Laserfiche WebLink
Job Condition Correction Factor <br />Operator Skill: <br />0.750 <br />Material consistency: <br />1.100 <br />Dozing method: <br />1.000 <br />Visibility: <br />1.000 <br />Job efficiency: <br />0.830 <br />Spoil pile: <br />0.800 <br />Push gradient: <br />1.000 <br />Altitude: <br />1.000 <br />Material Weight: <br />0.902 <br />Blade type: <br />1.000 <br />Net correction: 0.4941 <br />Adjusted unit production: 1,042.80 LCY/hr <br />Adjusted fleet production: 1042.8 LCY/hr <br />JOB TIME AND COST <br />Fleet size: 1 Dozer(s) <br />Unit cost: $0.219/LCY <br />Total job time: 0.73 Hours <br />Total job cost: $168 <br />Source <br />(AVG.) <br />(CAT HB) <br />(GEN.) <br />(AVG.) <br />(1 SHIFT/DAY) <br />(FND-RF) <br />(CAT HB) <br />(CAT HB) <br />(CAT HB) <br />(PAT) <br />