My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-10-11_REVISION - C1981041
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981041
>
2017-10-11_REVISION - C1981041
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/12/2017 12:04:29 PM
Creation date
10/12/2017 6:26:38 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981041
IBM Index Class Name
Revision
Doc Date
10/11/2017
Doc Name
Adequacy Review - Preliminary
From
DRMS
To
Snowcap Coal Company
Type & Sequence
RN7
Email Name
JHB
JRS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task description: <br />Site: Roadside Portals <br />BULLDOZER WORK <br />Spread topsoil over .2 acres for Substation A (Area #28) <br />Permit Action: RN7 Permit/Job#: C1981041 <br />PROJECT IDENTIFICATION <br />Task #: 201 State: Colorado <br />Date: 9/27/2017 County: Mesa <br />User: JHB <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: <br />Cat D9T - 9SU <br />Horsepower: <br />405 <br />Blade Type: <br />Semi -Universal <br />Attachment: <br />3 -shank ripper <br />Shift Basis: <br />1 per day <br />Data Source: <br />(CRG) <br />Cost Breakdown: <br />Ownership Cost/flour: <br />Operating Cost/Hour: <br />Ripper own. <br />Cost/Hour: <br />Ripper op. Cost/Hour: <br />Operator Cost/flour: <br />Abbreviation: None <br />Filename: C041-201 <br />$100.59 <br />Utilization % <br />NA <br />$87.23 <br />100 <br />$10.94 <br />NA <br />$0.00 <br />0 <br />$40.52 <br />NA <br />Total unit Cost/Hour: $239.28 <br />Total Fleet Cost/Hour: $239.28 <br />MATERIAL OUANTITIES <br />Initial Volume: 162 <br />Swell factor: 1.000 <br />Loose volume: 162 LCY <br />Source of estimated volume: <br />Source of estimated swell <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly <br />production: <br />Materials consistency description: <br />Average push gradient: 0% <br />Average site altitude: <br />Material weight: <br />Weight description: <br />6" over .2 acres <br />Cat Handbook <br />50 feet <br />2,110.5 LCY/hr <br />Loose stockpile 1.2 <br />5,500 feet <br />1.600 lbs/LCY <br />Soil <br />
The URL can be used to link to this page
Your browser does not support the video tag.