My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-10-11_HYDROLOGY - M1988112
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1988112
>
2017-10-11_HYDROLOGY - M1988112
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/12/2017 4:38:31 PM
Creation date
10/11/2017 5:19:04 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
HYDROLOGY
Doc Date
10/11/2017
Doc Name
Tailing Dam Report
From
Battle Mountain Resources
To
DRMS
Annual Report Year
2017
Report Quarter_Month
2
Email Name
LJW
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2017 Annual Darn Safety Inspection Julio Madrid <br /> San Luis TSF Battle Mountain Resources, Inc. <br /> Lower Downstream Face (Photos 26-32): The presence of minor erosional rilling and gullying <br /> was observed at the lower downstream face south of the underdrain outlet (Figure 2, Photo 27). <br /> The individual rills observed are discontinuous, and are frequently interrupted by brushy <br /> vegetation. The absence of significant sediment deposits on the left downstream groin liner <br /> indicates that erosion of the dam face is not problematic at this time (Photos 26, 28, 29, 30). The <br /> condition is presently judged to be minor; however, development of erosional rills and gulleys at <br /> the downstream face should be monitored closely to make sure erosion does not progress to <br /> detrimental levels. <br /> Brush/Debris/Vegetation Removal(Photos 19,30): Minor deposits of brush and sediment have <br /> started to accumulate in the drop structure outlet basin (Photo 19), and at the inlet of the access <br /> road culvert at the left downstream groin (Photo 30). Vegetation is beginning to develop in the <br /> drop structure outlet basin. This debris should be removed to maintain the capacity of these surface <br /> drainage features. <br /> CONCLUSIONS <br /> Based on the observations described above, the overall surficial condition of the dam is judged to <br /> be `Conditionally Satisfactory' pending completion of the minor improvements described herein <br /> and replacement of the drop structure in 2018. Please don't hesitate to call should you have <br /> questions or concerns regarding this inspection report. <br /> Respectfully Submitted, <br /> Engineering Analytics, Inc. <br /> Ad J. <br /> Mark S. Abshire, P.E. <br /> Senior Geotechnical Engineer <br /> San Luis TSF_Q2 &Annual Dam 3 Engineering Analytics, Inc. <br /> Safety Inspection Report.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.