My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-10-11_PERMIT FILE - M2017012
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2017012
>
2017-10-11_PERMIT FILE - M2017012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/17/2021 3:06:28 PM
Creation date
10/11/2017 5:16:21 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2017012
IBM Index Class Name
PERMIT FILE
Doc Date
10/11/2017
Doc Name
Special Use Permit Application
From
Amazonite Mining, LLC
To
DRMS
Email Name
ERR
WHE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
H. Reclamation. Describe the annual and final reclamation standards based on the anticipated schedule for construction, <br /> operations, and prolecf closure. Include such items as the removal of structures and facitties including bridges and culverts, a <br /> ipV gelattton plan,pemonent containment of mite talhigs, waste,or sludges which pose a threat of a release into the environment, <br /> closing ponds and eliminating standing water,a final surface shaping plan,and post operations monitoring and maintenance plans. <br /> Annual reclamation will be done prior to November 30th on those excavated areas deemed not worth expanding.They <br /> will be back filled and graded to their original grade.Where topsoil is located,it will be salvaged and maintained on site <br /> adjacent to the excavated area.This topsoil will be replaced on those backfilled areas and seeded with a blend of native <br /> grass seed approved by the Forest Service.Any topsoil stockpile not replaced by the end of the annual season wilt be <br /> seeded to prevent erosion.Any overburden not replaced by the end of the annual season will be stabilized. <br /> Final reclamation will be done within one year expiration of approved Plan of Operations.All excavated and other <br /> disturbed areas will be reclaimed as stated above in the annual reclamation process. <br /> VI. FOREST SERVICE EVALUATION OF PLAN OF OPERATIONS <br /> A. Required changes/modifications/special mitigation for plan of operations: <br /> B. Bond. Reclamation of ail disturbances connected with this plan of operations is covered by Reclamation <br /> Performance Bond No. , dated (mm/ddlyy) , signed by (Principal) and (Surety), for the <br /> penal sun of . This Reclamation Performance Bond is a guarantee of faithful performance with the terms and <br /> conditions listed below, and with the reclamation requirements agreed upon in the plan of operations. This <br /> Reclamation Performance Bond also extends to and includes any unauthorized activities conducted in connection <br /> with this operation. <br /> The bond amount for this Reclamation Performance Bond was based on a bond calculation worksheet The bond amount may be <br /> adjusted during the term of this proposed plan of operations in response to changes in the operations orb changes in the economy. <br /> Both the Reclamation Performance Bond and the bond calculation worksheet are attached to and made part of this plan of <br /> operations. Acceptable bond securities(subject to change)include: <br /> 1. Negotiable Treasury bills and notes which are unconditionally guaranteed as to both principle and interest in an amount <br /> equal at their par value to the penal sum of the bond;or <br /> 2. Certified or cashier's check,bank draft,Post Office money order,cash,assigned certificate of deposit,assigned savings <br /> account,blanket bond,or an inevvcable letter of credit equal to the penal sun of the bond. <br /> (Ifmorespace Is weeded told'oat a block of information,use adjard sheets and attachfore) <br /> -6- <br />
The URL can be used to link to this page
Your browser does not support the video tag.