Laserfiche WebLink
September, 2017 <br />Horse Gulch Fill Quarterly Inspection Report <br />Third Quarter 2017 <br />Table of Contents <br />1.0 Introduction <br />2 <br />2.0 Critical Construction Periods <br />4 <br />2.1 Removal of All Organic Material and Topsoil <br />4 <br />2.2 Placement of Underdrainage Systems <br />4 <br />2.3 Installation of Surface Drainage Systems <br />4 <br />2.4 Placement and Compaction of Fill Materials <br />4 <br />2.5 Revegetation <br />6 <br />3.0 References <br />6 <br />I certify that this report was prepared by me. <br />Tonia Marie Perkins <br />CO PE 43864 <br />Mining Engineer <br />Trapper Mining, Inc. <br />1 <br />LL <br />1E <br />864 �i•O <br />z' <br />864 c <br />U ®N A` <br />11/11/111111111W <br />