My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-10-05_REVISION - M2006081
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2006081
>
2017-10-05_REVISION - M2006081
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:35:17 PM
Creation date
10/6/2017 3:31:57 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2006081
IBM Index Class Name
REVISION
Doc Date
10/5/2017
Doc Name
Request For Amendment To Permit
From
Daniel & Barbara Gaudreault
To
DRMS
Type & Sequence
AM1
Email Name
ERR
WHE
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
129
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PWFLEGEND <br /> ' 112 PERMIT BOUNDARY <br /> h��• �9yS? 100-YEAR FLOOD ( — — ADJACENT PROPERTIES <br /> PLA3 A� CANIAL NORTH OF ` ADJACENT PROPERTY <br /> OWNER <br /> 10'CONTOUR INTERVAL <br /> a�b N7 FROM USGS TOPO <br /> �/,moo• � .7' a4 5,1 5 <br /> / wasp LNG ?04.S N801 iV <br /> k AREAS --'i �. O PUBLIC ROADS <br /> HAUL ROAD <br /> S ODKPILES UCT RANCH FENCE <br /> 0 <br /> Q A�?1ro <br /> OHE OVERHEAD POWER LINE <br /> ROCKY FORD <br /> F <br /> PHASE 1 \J <br /> o ` S HIGHLINE CANAL S R PHASE BOUNDARY <br /> NSP <br /> ~ ;3• _ _ PR� DIRECTION OF MINING <br /> PS IL **A <br /> P <br /> (^ S PIL 1► �, ---—' TOPSOIL STOCKPILE <br /> PHASE 4 ', NZ, <br /> PRODUCT STOCKPILE <br /> 6 b40 PHASE 2 p : <br /> N <br /> r34 100-YEAR FLOOD <br /> 9g, INTERNAL a o / PLAIN NORTH OF MINING TIME TABLE LIL ROADS <br /> O10 sgso sa O \ CANAL PHASE 1: 55.5 ACRES <br /> tip. / 1► BjS.�, START MINING FALL OF 2006, AND TAKE FOUR (12) YEARS TO MINE, <br /> PHASE 1 1► HsrsS2a 2006-2018. <br /> OB PHASE 5 1� PHASE 2: 20.7 ACRES <br /> ,p 1�y.+A 5j �� PHASE 3 YEARS TO MINE, 2018-2023. <br /> MINING IS TO START AFTER PHASE 1 & PLANS TO TAKE FIVE (5) <br /> O J'�� � �i{ S6T I <br /> yF �'�� �� PHASE 3: 28.6 ACRES <br /> PROJECT 1► 9 MINING IS TO START AFTER PHASE 2 & PLANS TO TAKE FIVE (5) <br /> \ BENCHMARK 4'47' YEARS TO MINE, 2023-2028. <br /> 11 k�0�� 8w <br /> PHASE 4: 30.6 ACRES <br /> **A / ~ I PHASE 1 MINING IS TO START AFTER PHASE 3 & PLANS TO TAKE FIVE (5) <br /> 3 YEARS TO MINE, 2028-2033. <br /> PIT h�� PHASE 5: 47.1 ACRES <br /> NTRANCE / PHASE 6 MINING IS TO START AFTER PHASE 4 & PLANS TO TAKE EIGHT (8) <br /> p I YEARS TO MINE, 2033-2041. <br /> PHASE 6: 33.8 ACRES <br /> O 50 s' ti p � �,�% MINING IS TO START AFTER PHASE 5 & PLANS TO TAKE THREE (6) <br /> c :ham' Q YEARS TO MINE, 2041-2047. <br /> + v o� <br /> �— �--- X 1 �Q� ,A"- ALL DATES ARE DEPENDENT ON MARKET DEMAND. <br /> RECLAMATION WILL BE DONE CONCURRENTLY WITH MINING. <br /> 12 + 1 <br /> AMENDMENT /+ <br /> OID Parcel Number Owner Name ID Parcel Number Owner Name BIG "G" GRAVEL PIT <br /> 1 113SOOD061 SANCHEZ STEVEN 9 1136000001 STATE OF COLORADO <br /> 2 1135000060 ROMERO DAVID E+SUSAN 10 1100000135 GAUDREAULT DANIELJ TR CLIENT: <br /> N 0 500 1000 APPROXIMATE COORDINATES 3 1100000100 GAUDREAULT DANIELJ TR 11 1100000094 DOOLIN LAVINA MARIE Daniel J. Gaudreault& Barbara J. Gaudreault <br /> AT ENTRY GATE CONSULTANT: <br /> SCALE: 1"=500' 4 1135000079 HERNANDEZ RODOLFO+LUCIA 12 1135000083 JOHNSON DARRYLW+DEBORAHS GAGLIANO ENGINEERING, INC. <br /> CONTOUR INTERVAL 10 FEET 38.18569'N LAT 5 1100000123 HIGH LINE CANAL CO 13 1135000091 DOOLIN LAVINA MARIE <br /> BASEMAP SOURCE: USGS 7.5'QUAD OF PREPARED BY: <br /> NEPESTA,COLO.,2016 104.19637°W LON 6 1100000134 MARTIN MARIETTA MATERIALS DRMS FILE NO.M-2006-081 J.V. GAGLIANO <br /> 7 110DOOD093 TUBERGEN PATRICIA <br /> EXHIBITC MINING MAP DATE:10/03/17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.