Laserfiche WebLink
<br /> <br />1313 Sherman Street, Room 215, Denver, CO 80203 P 303.866.3567 F 303.832.8106 http://mining.state.co.us <br />John W. Hickenlooper, Governor | Robert W. Randall, Executive Director | Virginia Brannon, Director <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203 <br /> <br /> <br />October 6, 2017 <br /> <br /> <br />Joe Brinton <br />CAM Mining, LLC <br />2352 N 7th Street, Unit C <br />Grand Junction, CO 81501 <br /> <br /> <br />Re: Munger Canyon Mine (Permit No. C-1981-020) <br /> Technical Revision No. 28 (TR-28) <br /> Revise Permit Boundary <br /> <br /> <br />Dear Mr. Brinton: <br /> <br />We have received your technical revision application to revise your permit to conduct coal mining in <br />Colorado. Our initial review indicates that all preliminary items required by the Colorado Surface Coal <br />Mining Reclamation Act, Section 34-33-101 et seq., C.R.S., have been submitted. Thus, your application <br />has been considered complete for the purposes of filing as of October 6, 2017. All review and comment <br />periods as provided in the Act and the Regulations initiate from this date of filing. <br /> <br />Unless notification to the contrary accompanies this letter, the proposed newspaper advertisement <br />submitted with the application has been found to be satisfactory. You should publish this advertisement <br />as specified in Rule 2.08.4(6) of the Regulations. Proof of the publication of the advertisement must be <br />filed with the Division as soon as available after the publication date. <br /> <br />Coincident with the publication, a copy of the revision application, less confidential items, must be filed <br />for public inspection with the appropriate public office as specified by you in the notice. Any subsequent <br />changes or additions to the application must also be made in this copy, at the same time it is submitted to <br />the Division. <br /> <br />The Division has interpreted 30 CFR 746.18 to determine that this revision application does not <br />constitute a Mining Plan Action, therefore a copy of the revision application materials need not be sent to <br />the Office of Surface Mining for their review. Should, however, the revision change significantly during <br />the course of the Division’s review, the need for modification of your federal mine plan could at that time <br />be deemed necessary. <br />