Laserfiche WebLink
Stormwater Management Plan <br />SITE STABILIZATION and CONSTRUCTION ACTIVITY DATES <br />A record of dates when BMPs are installed or removed, stabilization measures are initiated, major grading <br />activities occur, and construction activities temporarily or permanently cease on a portion of the site shall <br />be maintained until final site stabilization is achieved and the Notice of Termination (NOT) is filed. This <br />form must be updated continuously throughout the project until the NOT is filed. NOTE: The General <br />Contractor shall complete at least 1 -pg of stabilization and grading activities for each month of active <br />construction. Activities noted in this log must reflect information provided on Site Maps. <br />MAJOR STABILIZATION AND GRADING ACTIVITIES <br />Description of Activity: <br />Contractor performing Activity: <br />Location: <br />Description of Activity: <br />Contractor performing Activity: <br />Location: <br />Description of Activity: <br />Contractor performing Activity: <br />Location: <br />Description of Activity: <br />Contractor performing Activity: <br />Location: <br />Description of Activity: <br />Contractor performing Activity: <br />Location: <br />Description of Activity: <br />Contractor performing Activity: <br />Location: <br />Description of Activity: <br />Contractor performing Activity: <br />Location: <br />Description of Activity: <br />Contractor performing Activity: <br />Location: <br />Description of Activity: <br />Contractor performing Activity: <br />Location: <br />Sunrise Mining, LLC <br />Revised August 9, 2017 <br />Begin (date): <br />Begin (date): <br />Begin (date): <br />Begin (date): <br />Begin (date): <br />Begin (date): <br />Begin (date): <br />Begin (date): <br />Begin (date): <br />End(date): <br />End(date): <br />End(date): <br />End(date): <br />End(date): <br />End(date): <br />End(date): <br />End(date): <br />End(date): <br />Page 20 of 30 <br />