Laserfiche WebLink
BORING NUMBER RWB-03 <br />�,N oogat PAGE 1 OF 1 <br />Mining Corporation <br />I PO."'. (........•o VAY OU <br />CLIENT Wildcat Mining Corporation PROJECT NAME New Access Road <br />PROJECT NUMBER Geotech-001 PROJECT LOCATION Hesperus, Colorado <br />DATE STARTED 1/19/12 COMPLETED 1/19/12 GROUND ELEVATION 8670.49 ft HOLE SIZE 6.75 in <br />DRILLING CONTRACTOR Enviro-Drill GROUND WATER LEVELS: <br />DRILLING METHOD Hollow Stem Auger 2.75' ID AT TIME OF DRILLING — No Free Water Encountered <br />LOGGED BY David McLay, P.E. CHECKED BY J. Erich Rauber, P.E. AT END OF DRILLING — No Free Water Encountered <br />NOTES AFTER DRILLING -- No Free Water Encountered <br />}a} <br />a w <br />_ g <br />> <br />_j n¢ <br />TESTS <br />x <br />0_0 <br />MATERIAL DESCRIPTION <br />WQ `� <br />mOZ <br />J <br />0 <br />= <br />0 <br />QZ <br />Luc <br />0 <br />(CL) Brown fine sandy silty Clay (hard) (fill) <br />AU w=12.9%, LL=29, <br />PI=14 <br />MC 9-16-19 w=30.0%, LL=27, <br />CL <br />5 .5'-5. ' 44 (35) PI=13 <br />19.0 <br />AU w=10.7%, LL=26, <br />6'-7' PI=12 <br />7.5 <br />8663.0 <br />(ML) Green -brown silty fine Sand (dense) <br />ML <br />8661.5 <br />8.5 <br />Refusal at 9.0 feet. <br />Bottom of borehole at 9.0 feet. <br />a <br />c� <br />0 <br />U) <br />U <br />w <br />O <br />a <br />F <br />z <br />0 <br />N <br />w <br />J <br />w <br />Q <br />0 <br />a_ <br />U <br />m <br />N <br />O_ <br />N <br />N <br />C1 <br />m <br />g <br />m <br />0 <br />Z <br />J <br />J <br />W <br />3 <br />a <br />x <br />m <br />J <br />Q <br />Uj <br />W <br />Z <br />W <br />0 <br />