Laserfiche WebLink
INLETS TO SEDIMENT BASIN <br />SHALL ENTER AT FURTHEST I" TO 2" S g <br />DISTANCE TO OUTLET AND SHALL CRUSHED ROCK CJ <br />CONSIST OF A TEMPORARY SLOPE <br />DRAIN RISER PIPE <br />r 6" PVC <br />RIPRAP PAD <br />HOLE 0",— 0 <br />DIAMETER, 00 <br />HO 01 <br />02 SPILLWAY <br />j 1" 03 <br />EL. 03.00 04 <br />— — 8 <br />e SINGLE <br />4- COLUMN <br />TYP t °OLESE SEDIMENT BASIN PLAN <br />1 *EXCEPT WHERE THE HOLES EXCEED <br />X01 DIAMETER, THEN UP TO TWO COLUMNS <br />OF SAME SIZED HOLES MAY BE USED <br />SCHEDULE 40 2 4 <br />PVC OR GREATER <br />1 EL, 0000 <br />EXCAVATION D50=9" RIPRAP <br />TYPE L. (SEE TABLE RIPRAP BEDDING <br />MO -7. MAJOR 12" <br />DRAINAGE, VOL. 1) <br />SECTION A <br />CL <br />3, CREST LENGTH <br />EMBANKMENT <br />MATERIAL EL. 03.00 <br />II <br />---� EL 04.00 1 AT CREST 3 <br />2" 1 'K� <br />D50=9" RIPRAP TYPE L <br />(SEE TABL S ECTI O N MAJOR BDRAINAGE. VOLA) <br />SB -1. SEDIMENT BASIN <br />SUNRISE MINING, LLC <br />BMP DETAILS <br />SEDIMENT BASIN <br />PREPARED BY: DJM <br />REVIEWED BY: DJM <br />REVISION DATE. 07-2B-11 FIGURE BMP 7 <br />