My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-09-28_REVISION - M1981185 (158)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1981185
>
2017-09-28_REVISION - M1981185 (158)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:31:07 PM
Creation date
10/4/2017 4:25:01 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1981185
IBM Index Class Name
Revision
Doc Date
9/28/2017
Doc Name Note
Part 3 of 12
Doc Name
Request For Amendment To Permit
From
Sunrise Mining, LLC
To
DRMS
Type & Sequence
AM2
Email Name
LJW
GRM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Access Portal Collapse Repair and Equipment and Stope Rock Removal Work Plan <br />March 2, 2012 <br />May Day No. 1 <br />3.4 Post Construction Monitoring Program <br />Monument control point(s) will be established at the site in close proximity to the portal/highwall <br />to monitor slope movement, if any. A benchmark control point will be established at an <br />undisturbed location at the site from which the slope movement monuments will be measured. <br />Design for this will be included in a final design report, and installation of monitoring devices <br />will be performed during Phase 2 activities. <br />3.5 Inspection and Maintenance Program <br />The inspection and maintenance program will generally consist of the following: <br />• Remove debris, slash, and trees to a temporary storage area; <br />• All paper, tape, wood lathes, etc., will be bagged and disposed in an offsite landfill; <br />• Inspect constructed slopes for signs of distress; <br />• Check condition of silt fences; <br />• Remove soil/rock buildup and repair any damage observed as necessary; <br />• Visually check and record cracks in constructed slopes and roadways; and, <br />• Measure slope movement monuments as necessary. <br />Health and Safety <br />Health and safety of all construction workers, inspectors and Visitors addressed illbe importantthe following during all <br />construction activities. Health and safety will generally <br />be <br />• A health and safety plan developed by the selected construction contractor; <br />• Daily tailgate safety meetings conducted by Wildcat; and, <br />• Documentation of health and safety tailgate meetings in daily log books. <br />Company Contact <br />Company communications should be directed to: <br />Randy Oser - President <br />Wildcat Mining Corporation <br />1630 Ringling Blvd. <br />Sarasota, FL 34236 <br />(941) 954-4481 <br />EnviroGroup Limited <br />DEN 97,749,013x3 2-29-12 <br />10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.