Laserfiche WebLink
EXHIBIT T PERMANENT MAN-MADE STRUCTURES <br />Figure T-1 Permanent Man -Made Structures Win 200 Ft. of May <br />Day Mine <br />Figure T-2 Permanent Man -Made Structures Win 200 Ft. of Idaho <br />Mine <br />Figure T-3 Structure Agreement <br />Figure T-4 Certified Mail Receipts — February 27", 2017 <br />Figure T-5 Signed Structure Agreements <br />Figure T-6 Certified Mail Receipts — September 2611, 2017 <br />Figure T-7 Geotechnical Stability Report New Access Road <br />Figure T-8 Adjoining Surface Owners of Record for the May Day <br />Mine <br />Figure T-9 Adjoining Surface Owners of Record for the Idaho <br />Mine <br />Figure T-10 Proof of Publication of Public Notice and Certified Mail <br />Receipts to the Adjacent Land Owners <br />EXHIBIT U DESIGNATED MINING OPERATION ENVIRONMENTAL <br />PROTECTION PLAN <br />Table U-1 Surface Water Quality Standard Comparative Analysis <br />Table U-2 Sampling Frequency Summary <br />Figure U-1 Stormwater Management Structures <br />Figure U-2 Surface and Groundwater Locations <br />Figure U-3 Permitted Well Location <br />Figure U-4 Geology Cross Section <br />Figure U-5 Geology Map <br />Figure U-6 Stormwater Management Structures <br />Attachment U-1 Safety Data Sheets <br />Attachment U-2 Domestic Well Information within the Study Area <br />Attachment U-3 Stormwater Management Plan <br />Attachment U-4 Mine Rock Geochemical and Mineralogical <br />Characterization <br />EXHIBIT V RULE 6.5 GEOTECHINCAL STABILITY <br />Attachment 6.5.1 Bridge Approved Renovation Plan <br />Attachment 6.5.2 Analysis of the Effect of Blasting Operations on <br />Structures <br />EXHIBIT W RULE 8 EMERGENCY MANAGEMENT AND RESPONSE PLAN <br />Figure 1 Site Location Map <br />Figure 2 Base of Operations <br />Figure 3 Road Milestone Markers <br />Figure 4 Water Storage Fire Suppression <br />