My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-09-28_REVISION - M1981185 (106)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1981185
>
2017-09-28_REVISION - M1981185 (106)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 3:16:35 PM
Creation date
10/4/2017 4:22:57 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1981185
IBM Index Class Name
Revision
Doc Date
9/28/2017
Doc Name Note
Part 1 of 12
Doc Name
Request For Amendment To Permit
From
Sunrise Mining, LLC
To
DRMS
Type & Sequence
AM2
Email Name
LJW
GRM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MAY DAY IDAHO MINE COMPLEX <br />M -1981-185,112d-2 AMENDMENT (AM -2) APPLICATION <br />TABLE OF CONTENTS <br />APPENDICES <br />EXHIBIT A LEGAL DESCRIPTION <br />Exhibit A-1 Results of Survey to Date <br />EXHIBIT B INDEX MAP <br />Figure B-1 Regional Location of Affected Lands <br />EXHIBIT C PRE -MINING AND MINING PLAN MAPS OF AFFECTED LANDS <br />Figure C-1 Total Operational Area <br />Figure C-2 Adjoining Surface Owners of Record for May Day Mine <br />Figure C-2 Adjoining Surface Owners of Record for Idaho Mine <br />Figure C-3 Existing Topography <br />Figure C-4 Vegetation Data <br />Figure C-5 Soils Map <br />Figure C-6 Surface and Groundwater Sample Locations <br />Figure C-7 Stormwater Management Structures <br />Figure C-8 Base of Operations <br />Figure C-9 Access Road — Base of Operations <br />Figure C-10 May Day No. 1 Mine Site <br />Figure C-11 May Day No. 2 Mine Site <br />Figure C-12 May Day No. 2 Mine Site <br />Figure C-13 Chief Portal <br />Figure C-14 Pay Day Idaho Mine Site <br />Figure C-15 Road Grades <br />Figure C-16 Road Grades <br />EXHIBIT D MINING PLAN <br />Figure D-1 Total Operational Area <br />Figure D-2 Geologic Block Model Mine Development <br />Figure D-3 Base of Operations <br />Figure D-4 Ore Stockpiles <br />Figure D-5 Access Road — Base of Operations <br />Figure D-6 May Day No. 1 Mine Site <br />Figure D-7 May Day No. 2 Site Map <br />Figure D-8 May Day No. 2 <br />Figure D-9 Stormwater Management Structures <br />Figure D-10 Chief Mine Portal <br />Figure D-11 Pay Day Idaho Mine Site <br />Figure D -12a Road Grades <br />Figure D -12b Road Grades <br />Attachment D-1 May Day No. 1 As -Built Report <br />Attachment D-2 Bridge Renovation <br />Attachment D-3 Whole Rock Chemical Characterization <br />Attachment D-4 Whole Rock Analytical Results <br />
The URL can be used to link to this page
Your browser does not support the video tag.